Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2012 |
Principal Product | Bare and tinned un-insulated copper wire |
NAICS | 331420 - Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351 - Copper Rolling And Drawing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 79 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 37,745,500 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $538,013 | 13,333,019 | kWh | $0.04 |
Electricity Demand | $187,740 | 18,000 | kW-months/year | $10.43 |
Electricity Fees | $322,182 | - | $ | - |
Natural Gas | $38,771 | 6,092 | MMBtu | $6.36 |
TOTAL ENERGY COSTS | $1,086,706 | |||
RECOMMENDED SAVINGS* | $85,859 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,327 Cost: - |
$6,327 | 156,624 | - | - | - | - | - | - |
$6,327 156,624 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5145 RECOVER AND REUSE SPENT ACID BATHS |
Savings: $28,847 Cost: $792 |
- | - | - | - | - | - | $28,847 | - |
- - kWh |
- - kW-months/year |
- - $ |
$28,847 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $8,269 Cost: $1,357 |
$8,269 | 204,672 | - | - | - | - | - | - |
$8,269 204,672 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $317 Cost: $140 |
$88 | 2,190 | $31 | 3 | $119 | - | $79 | - |
$88 2,190 kWh |
$31 3 kW-months/year |
$119 - $ |
$79 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $149 Cost: $652 |
$149 | 3,688 | - | - | - | - | - | - |
$149 3,688 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $33,502 Cost: $167,290 |
$(-14,874) | (-368,160) | $(-7,384) | (-708) | - | - | $55,760 | - |
$(-14,874) (-368,160) kWh |
$(-7,384) (-708) kW-months/year |
- - $ |
$55,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $8,366 Cost: $42,403 |
- | - | - | - | - | - | $8,366 | - |
- - kWh |
- - kW-months/year |
- - $ |
$8,366 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $82 Cost: $436 |
$55 | 1,373 | $27 | 3 | - | - | - | - |
$55 1,373 kWh |
$27 3 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $85,859 Cost: $213,070 |
$14 | 387 | $(-7,326) | (-702) | $119 | - | $93,052 | - | $14 387 kWh |
$(-7,326) (-702) kW-months/year |
$119 - $ |
$93,052 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost |