IAC Assessment: SU0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2013
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $100,000,000-$500,000,000
# of Employees 900
Plant Area (Sq.Ft.) 216,117
Annual Production 24,400 Pieces
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $942,458 15,571,447 kWh $0.06
Natural Gas $33,174 6,322 MMBtu $5.25
Other Energy $1,612,483 9,953,195 MMBtu $0.16
TOTAL ENERGY COSTS $2,588,115
RECOMMENDED SAVINGS* $263,926 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,521
Cost:
-
$5,521 91,104 - - - - $5,521
91,104
kWh
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$248,290
Cost:
$56,904
$(-37,266) (-662,507) $(-5,884) - $291,440 - $(-37,266)
(-662,507)
kWh
$(-5,884)
-
$
$291,440
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$2,654
Cost:
$9,540
$2,654 43,800 - - - - $2,654
43,800
kWh
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,461
Cost:
$28,728
$3,293 54,332 $2,568 - $1,600 - $3,293
54,332
kWh
$2,568
-
$
$1,600
-
$
TOTAL RECOMMENDED Savings:
$263,926
Cost:
$95,172
$(-25,798) (-473,271) $(-3,316) - $293,040 - $(-25,798)
(-473,271)
kWh
$(-3,316)
-
$
$293,040
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Personnel Changes One-time Revenue or Avoided Cost