IAC Assessment: SU0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2013
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $1,000,000-$5,000,000
# of Employees 6
Plant Area (Sq.Ft.) 12,800
Annual Production 63,286 Tons
Production Hrs. Annual 2,120
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,168 157,248 kWh $0.29
Fuel Oil #2 $422,878 15,092 MMBtu $28.02
TOTAL ENERGY COSTS $468,046
RECOMMENDED SAVINGS* $312,429 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $291,300
#|Description Savings
Cost
Status Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost
$ kWh $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$20,297
Cost:
$5,686
$20,297 69,957 - - $20,297
69,957
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$832
Cost:
$386
$832 2,869 - - $832
2,869
kWh
-
-
$
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$288,725
Cost:
$218,600
- - $288,725 - -
-
kWh
$288,725
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,709
Cost:
$5,124
$1,709 5,894 - - $1,709
5,894
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$866
Cost:
$2,820
$866 2,985 - - $866
2,985
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$312,429
Cost:
$232,616
$23,704 81,705 $288,725 - $23,704
81,705
kWh
$288,725
-
$
TOTAL IMPLEMENTED Savings:
$291,300
Cost:
$226,544
$2,575 8,879 $288,725 - $2,575
8,879
kWh
$288,725
-
$
Savings
Cost
$ kWh $ $
Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost