Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2013 |
Principal Product | Asphalt |
NAICS | 324121 - Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951 - Asphalt Paving Mixtures And Blocks |
Sales | $1,000,000-$5,000,000 |
# of Employees | 6 |
Plant Area (Sq.Ft.) | 12,800 |
Annual Production | 63,286 Tons |
Production Hrs. Annual | 2,120 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,168 | 157,248 | kWh | $0.29 |
Fuel Oil #2 | $422,878 | 15,092 | MMBtu | $28.02 |
TOTAL ENERGY COSTS | $468,046 | |||
RECOMMENDED SAVINGS* | $312,429 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $291,300 |
#|Description |
Savings Cost |
Status | Electricity Usage | One-time Revenue or Avoided Cost | Electricity Usage | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $20,297 Cost: $5,686 |
$20,297 | 69,957 | - | - |
$20,297 69,957 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $832 Cost: $386 |
$832 | 2,869 | - | - |
$832 2,869 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $288,725 Cost: $218,600 |
- | - | $288,725 | - |
- - kWh |
$288,725 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,709 Cost: $5,124 |
$1,709 | 5,894 | - | - |
$1,709 5,894 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $866 Cost: $2,820 |
$866 | 2,985 | - | - |
$866 2,985 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $312,429 Cost: $232,616 |
$23,704 | 81,705 | $288,725 | - | $23,704 81,705 kWh |
$288,725 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $291,300 Cost: $226,544 |
$2,575 | 8,879 | $288,725 | - | $2,575 8,879 kWh |
$288,725 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | One-time Revenue or Avoided Cost | Electricity Usage | One-time Revenue or Avoided Cost |