IAC logo
IAC Assessment: SU0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2013
Principal Product Electronics
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 30,000
Annual Production 3,537,660 Pieces
Production Hrs. Annual 2,125
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,204 1,203,940 kWh $0.06
Electricity Demand $39,816 4,871 kW-months/year $8.17
Electricity Fees $3,988 - $ -
Natural Gas $21,009 1,937 MMBtu $10.85
TOTAL ENERGY COSTS $146,033
RECOMMENDED SAVINGS* $27,929 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,823
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,585
Cost:
-
- - - - - - $11,585 - -
-
kWh
-
-
kW-months/year
-
-
$
$11,585
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,541
Cost:
-
- - - - - - $8,541 - -
-
kWh
-
-
kW-months/year
-
-
$
$8,541
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,961
Cost:
-
- - - - - - $1,961 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,961
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,426
Cost:
-
$348 5,500 $1,078 132 - - - - $348
5,500
kWh
$1,078
132
kW-months/year
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$295
Cost:
-
$99 1,561 $196 24 - - - - $99
1,561
kWh
$196
24
kW-months/year
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$504
Cost:
$102
$292 4,611 $212 26 - - - - $292
4,611
kWh
$212
26
kW-months/year
-
-
$
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$405
Cost:
$85
$233 3,677 $172 21 - - - - $233
3,677
kWh
$172
21
kW-months/year
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,799
Cost:
$740
$1,799 28,419 - - - - - - $1,799
28,419
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$355
Cost:
$463
$139 2,190 $25 3 $112 - $79 - $139
2,190
kWh
$25
3
kW-months/year
$112
-
$
$79
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$430
Cost:
$1,448
$430 6,788 - - - - - - $430
6,788
kWh
-
-
kW-months/year
-
-
$
-
-
$
11: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$357
Cost:
$376
$357 5,643 - - - - - - $357
5,643
kWh
-
-
kW-months/year
-
-
$
-
-
$
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$271
Cost:
$970
$271 4,282 - - - - - - $271
4,282
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$27,929
Cost:
$4,184
$3,968 62,671 $1,683 206 $112 - $22,166 - $3,968
62,671
kWh
$1,683
206
kW-months/year
$112
-
$
$22,166
-
$
TOTAL IMPLEMENTED Savings:
$26,823
Cost:
$1,681
$3,034 47,924 $1,511 185 $112 - $22,166 - $3,034
47,924
kWh
$1,511
185
kW-months/year
$112
-
$
$22,166
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost