Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2014 |
Principal Product | Alternator and enginer starter parts |
NAICS | 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing |
SIC | 3694 - Engine Electrical Equipment |
Sales | $50,000,000-$100,000,000 |
# of Employees | 390 |
Plant Area (Sq.Ft.) | 331,000 |
Annual Production | 348,419 Pieces |
Production Hrs. Annual | 5,902 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $164,944 | 8,331,500 | kWh | $0.02 |
Electricity Demand | $65,404 | 14,697 | kW-months/year | $4.45 |
Electricity Fees | $8,168 | - | $ | - |
Natural Gas | $427,050 | 86,401 | MMBtu | $4.94 |
TOTAL ENERGY COSTS | $753,008 | |||
RECOMMENDED SAVINGS* | $89,417 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,441 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2123 INSULATE FEEDWATER TANK |
Savings: $1,037 Cost: $137 |
- | - | - | - | $1,037 | 210 | - | - |
- - kWh |
- - kW-months/year |
$1,037 210 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,651 Cost: $1,900 |
$5,651 | 282,564 | - | - | - | - | - | - |
$5,651 282,564 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,346 Cost: $470 |
$1,346 | 67,283 | - | - | - | - | - | - |
$1,346 67,283 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $931 Cost: $855 |
$158 | 7,884 | $49 | 11 | - | - | $724 | - |
$158 7,884 kWh |
$49 11 kW-months/year |
- - MMBtu |
$724 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $78,976 Cost: $119,000 |
- | - | - | - | $78,976 | 15,987 | - | - |
- - kWh |
- - kW-months/year |
$78,976 15,987 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,476 Cost: $4,124 |
$1,476 | 73,775 | - | - | - | - | - | - |
$1,476 73,775 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $89,417 Cost: $126,486 |
$8,631 | 431,506 | $49 | 11 | $80,013 | 16,197 | $724 | - | $8,631 431,506 kWh |
$49 11 kW-months/year |
$80,013 16,197 MMBtu |
$724 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,441 Cost: $7,486 |
$8,631 | 431,506 | $49 | 11 | $1,037 | 210 | $724 | - | $8,631 431,506 kWh |
$49 11 kW-months/year |
$1,037 210 MMBtu |
$724 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |