IAC logo
IAC Assessment: SU0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2014
Principal Product Alternator and enginer starter parts
NAICS 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3694 - Engine Electrical Equipment
Sales $50,000,000-$100,000,000
# of Employees 390
Plant Area (Sq.Ft.) 331,000
Annual Production 348,419 Pieces
Production Hrs. Annual 5,902
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,944 8,331,500 kWh $0.02
Electricity Demand $65,404 14,697 kW-months/year $4.45
Electricity Fees $8,168 - $ -
Natural Gas $427,050 86,401 MMBtu $4.94
TOTAL ENERGY COSTS $753,008
RECOMMENDED SAVINGS* $89,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,441
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2123 INSULATE FEEDWATER TANK Savings:
$1,037
Cost:
$137
- - - - $1,037 210 - - -
-
kWh
-
-
kW-months/year
$1,037
210
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,651
Cost:
$1,900
$5,651 282,564 - - - - - - $5,651
282,564
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,346
Cost:
$470
$1,346 67,283 - - - - - - $1,346
67,283
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$931
Cost:
$855
$158 7,884 $49 11 - - $724 - $158
7,884
kWh
$49
11
kW-months/year
-
-
MMBtu
$724
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$78,976
Cost:
$119,000
- - - - $78,976 15,987 - - -
-
kWh
-
-
kW-months/year
$78,976
15,987
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,476
Cost:
$4,124
$1,476 73,775 - - - - - - $1,476
73,775
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$89,417
Cost:
$126,486
$8,631 431,506 $49 11 $80,013 16,197 $724 - $8,631
431,506
kWh
$49
11
kW-months/year
$80,013
16,197
MMBtu
$724
-
$
TOTAL IMPLEMENTED Savings:
$10,441
Cost:
$7,486
$8,631 431,506 $49 11 $1,037 210 $724 - $8,631
431,506
kWh
$49
11
kW-months/year
$1,037
210
MMBtu
$724
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes