IAC Assessment: SU0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2018
Principal Product Powdered/ Sintered Metal Products
NAICS 332117 - Powder Metallurgy Part Manufacturing
SIC 3399 - Primary Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 52
Plant Area (Sq.Ft.) 50,000
Annual Production 2,732,000 Pounds
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,383 2,706,000 kWh $0.08
Electricity Demand $47,296 6,593 kW-months/year $7.17
Electricity Fees $659 - $ -
Natural Gas $23,880 9,366 MMBtu $2.55
TOTAL ENERGY COSTS $286,218
RECOMMENDED SAVINGS* $9,877 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,877
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$4,250
Cost:
$2,600
$4,250 53,664 - - - - $4,250
53,664
kWh
-
-
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,562
Cost:
$2,313
$2,718 34,320 $473 66 $371 - $2,718
34,320
kWh
$473
66
kW-months/year
$371
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$631
Cost:
$1,100
$631 7,991 - - - - $631
7,991
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$201
Cost:
$168
$132 1,664 $16 2 $53 - $132
1,664
kWh
$16
2
kW-months/year
$53
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$624
Cost:
$702
$624 7,884 - - - - $624
7,884
kWh
-
-
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$609
Cost:
$1,336
$609 7,688 - - - - $609
7,688
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$9,877
Cost:
$8,219
$8,964 113,211 $489 68 $424 - $8,964
113,211
kWh
$489
68
kW-months/year
$424
-
$
TOTAL IMPLEMENTED Savings:
$9,877
Cost:
$8,219
$8,964 113,211 $489 68 $424 - $8,964
113,211
kWh
$489
68
kW-months/year
$424
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost