IAC logo
IAC Assessment: SU0471
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0471
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2018
Principal Product Frozen Cheese Filled Pasta
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2038 - Frozen Specialties, Nec
Sales $50,000,000-$100,000,000
# of Employees 30
Plant Area (Sq.Ft.) 60,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 5,330
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,796 2,134,486 kWh $0.05
Electricity Demand $91,674 7,630 kW-months/year $12.01
Electricity Fees $3,962 - $ -
Natural Gas $54,630 10,919 MMBtu $5.00
TOTAL ENERGY COSTS $252,062
RECOMMENDED SAVINGS* $8,067 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,238
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$529
Cost:
$179
- - - - - - $529 106 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$529
106
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,460
Cost:
$2,625
$1,790 35,800 $1,004 84 - - - - - - $666 - $1,790
35,800
kWh
$1,004
84
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$666
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$247
Cost:
$271
$118 2,365 $38 3 - - - - $64 - $26 - $118
2,365
kWh
$38
3
kW-months/year
-
-
$
-
-
MMBtu
$64
-
$
$26
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$955
Cost:
$1,560
$955 19,095 - - - - - - - - - - $955
19,095
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$703
Cost:
$1,240
$703 14,055 - - - - - - - - - - $703
14,055
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$75
Cost:
$172
- - - - - - $75 15 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$75
15
MMBtu
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,099
Cost:
$6,608
- - - - $2,099 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,099
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$8,067
Cost:
$12,655
$3,566 71,315 $1,042 87 $2,099 - $604 121 $64 - $692 - $3,566
71,315
kWh
$1,042
87
kW-months/year
$2,099
-
$
$604
121
MMBtu
$64
-
$
$692
-
$
TOTAL IMPLEMENTED Savings:
$4,238
Cost:
$4,037
$2,493 49,855 $1,004 84 - - $75 15 - - $666 - $2,493
49,855
kWh
$1,004
84
kW-months/year
-
-
$
$75
15
MMBtu
-
-
$
$666
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost