IAC logo
IAC Assessment: SU0487
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0487
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2019
Principal Product medical Instrumentation
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 239,425
Annual Production 2,700,000 Units
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $533,018 10,422,032 kWh $0.05
Electricity Demand $205,857 14,356 kW-months/year $14.34
Electricity Fees $10,425 - $ -
Natural Gas $134,558 32,788 MMBtu $4.10
TOTAL ENERGY COSTS $1,183,858
RECOMMENDED SAVINGS* $31,775 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,781
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,476
Cost:
-
- - - - - - - - $1,476 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,476
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$185
Cost:
-
- - - - $185 45 - - - - -
-
kWh
-
-
kW-months/year
$185
45
MMBtu
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,639
Cost:
$240
- - - - - - - - $3,639 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,639
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,098
Cost:
$165
$673 13,200 $1,656 116 $(-231) (-56) - - - - $673
13,200
kWh
$1,656
116
kW-months/year
$(-231)
(-56)
MMBtu
-
-
$
-
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$12,498
Cost:
$9,690
$(-265) (-5,200) $(-2,237) (-152) - - $6,000 - $9,000 - $(-265)
(-5,200)
kWh
$(-2,237)
(-152)
kW-months/year
-
-
MMBtu
$6,000
-
$
$9,000
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$992
Cost:
$1,073
$375 7,359 $145 10 - - $306 - $166 - $375
7,359
kWh
$145
10
kW-months/year
-
-
MMBtu
$306
-
$
$166
-
$
07: 2.7314 REDUCE VENTILATION AIR Savings:
$4,618
Cost:
$5,591
$1,474 28,904 - - $3,144 767 - - - - $1,474
28,904
kWh
-
-
kW-months/year
$3,144
767
MMBtu
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,607
Cost:
$3,425
$2,607 51,127 - - - - - - - - $2,607
51,127
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$287
Cost:
$602
$287 5,634 - - - - - - - - $287
5,634
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,375
Cost:
$15,784
- - - - $3,375 823 - - - - -
-
kWh
-
-
kW-months/year
$3,375
823
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,775
Cost:
$36,570
$5,151 101,024 $(-436) (-26) $6,473 1,579 $6,306 - $14,281 - $5,151
101,024
kWh
$(-436)
(-26)
kW-months/year
$6,473
1,579
MMBtu
$6,306
-
$
$14,281
-
$
TOTAL IMPLEMENTED Savings:
$14,781
Cost:
$9,855
$408 8,000 $(-581) (-37) $(-46) (-11) $6,000 - $9,000 - $408
8,000
kWh
$(-581)
(-37)
kW-months/year
$(-46)
(-11)
MMBtu
$6,000
-
$
$9,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost