Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2022 |
Principal Product | Wire and Cable |
NAICS | 333318 - Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 83 |
Plant Area (Sq.Ft.) | 144,000 |
Annual Production | 55,330,518 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $636,066 | 14,447,552 | kWh | $0.04 |
Electricity Demand | $454,322 | 41,940 | kW-months/year | $10.83 |
Electricity Fees | $60,092 | - | $ | - |
Natural Gas | $62,720 | 12,079 | MMBtu | $5.19 |
TOTAL ENERGY COSTS | $1,213,200 | |||
RECOMMENDED SAVINGS* | $57,473 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $9,008 Cost: - |
$9,008 | 204,723 | - | - | - | - | - | - |
$9,008 204,723 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $22,430 Cost: $675 |
- | - | $22,430 | 2,028 | - | - | - | - |
- - kWh |
$22,430 2,028 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,219 Cost: $1,953 |
$4,219 | 95,882 | - | - | - | - | - | - |
$4,219 95,882 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,996 Cost: $9,943 |
$18,996 | 431,747 | - | - | - | - | - | - |
$18,996 431,747 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $46 Cost: $49 |
$19 | 438 | $6 | 1 | $21 | - | - | - |
$19 438 kWh |
$6 1 kW-months/year |
$21 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,774 Cost: $3,179 |
$1,607 | 36,517 | $692 | 64 | - | - | $475 | - |
$1,607 36,517 kWh |
$692 64 kW-months/year |
- - $ |
$475 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,473 Cost: $15,799 |
$33,849 | 769,307 | $23,128 | 2,092 | $21 | - | $475 | - | $33,849 769,307 kWh |
$23,128 2,092 kW-months/year |
$21 - $ |
$475 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Personnel Changes | One-time Revenue or Avoided Cost |