Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0514
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2022
Principal Product Wire and Cable
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 83
Plant Area (Sq.Ft.) 144,000
Annual Production 55,330,518 Pounds
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $636,066 14,447,552 kWh $0.04
Electricity Demand $454,322 41,940 kW-months/year $10.83
Electricity Fees $60,092 - $ -
Natural Gas $62,720 12,079 MMBtu $5.19
TOTAL ENERGY COSTS $1,213,200
RECOMMENDED SAVINGS* $57,473 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,008
Cost:
-
$9,008 204,723 - - - - - - $9,008
204,723
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$22,430
Cost:
$675
- - $22,430 2,028 - - - - -
-
kWh
$22,430
2,028
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,219
Cost:
$1,953
$4,219 95,882 - - - - - - $4,219
95,882
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,996
Cost:
$9,943
$18,996 431,747 - - - - - - $18,996
431,747
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46
Cost:
$49
$19 438 $6 1 $21 - - - $19
438
kWh
$6
1
kW-months/year
$21
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,774
Cost:
$3,179
$1,607 36,517 $692 64 - - $475 - $1,607
36,517
kWh
$692
64
kW-months/year
-
-
$
$475
-
$
TOTAL RECOMMENDED Savings:
$57,473
Cost:
$15,799
$33,849 769,307 $23,128 2,092 $21 - $475 - $33,849
769,307
kWh
$23,128
2,092
kW-months/year
$21
-
$
$475
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost