IAC logo
IAC Assessment: SU0515
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2022
Principal Product Compressed Gas
NAICS 325120 - Industrial Gas Manufacturing
SIC 2813 - Industrial Gases
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 130,000
Annual Production 650,000 Units
Production Hrs. Annual 6,260
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,737 706,000 kWh $0.06
Electricity Demand $24,226 1,257 kW-months/year $19.27
Electricity Fees $10,132 - $ -
Natural Gas $24,808 8,497 MMBtu $2.92
TOTAL ENERGY COSTS $99,903
RECOMMENDED SAVINGS* $13,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,299
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,532
Cost:
$95
- - - - $2,532 - - - - - -
-
kWh
-
-
kW-months/year
$2,532
-
$
-
-
MMBtu
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$531
Cost:
$95
- - - - - - - - $531 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$531
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,214
Cost:
$657
- - $1,214 63 - - - - - - -
-
kWh
$1,214
63
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,896
Cost:
$1,442
$(-75) (-1,287) $(-978) (-51) - - - - $2,949 - $(-75)
(-1,287)
kWh
$(-978)
(-51)
kW-months/year
-
-
$
-
-
MMBtu
$2,949
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$45
Cost:
$56
$122 2,103 $56 3 - - - - $(-133) - $122
2,103
kWh
$56
3
kW-months/year
-
-
$
-
-
MMBtu
$(-133)
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$142
Cost:
$189
$142 2,442 - - - - - - - - $142
2,442
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7314 REDUCE VENTILATION AIR Savings:
$1,768
Cost:
$2,413
$723 12,473 - - - - $1,045 358 - - $723
12,473
kWh
-
-
kW-months/year
-
-
$
$1,045
358
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$167
Cost:
$432
$167 2,875 - - - - - - - - $167
2,875
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,236
Cost:
$23,260
$(-537) (-9,261) - - - - $5,773 1,977 - - $(-537)
(-9,261)
kWh
-
-
kW-months/year
-
-
$
$5,773
1,977
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,530
Cost:
$28,639
$542 9,345 $292 15 $2,532 - $6,818 2,335 $3,347 - $542
9,345
kWh
$292
15
kW-months/year
$2,532
-
$
$6,818
2,335
MMBtu
$3,347
-
$
TOTAL IMPLEMENTED Savings:
$8,299
Cost:
$23,450
$(-537) (-9,261) - - $2,532 - $5,773 1,977 $531 - $(-537)
(-9,261)
kWh
-
-
kW-months/year
$2,532
-
$
$5,773
1,977
MMBtu
$531
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost