IAC logo
IAC Assessment: SU0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2022
Principal Product Cable, Wire Harness, Precision Machining
NAICS 332721 - Precision Turned Product Manufacturing
SIC 3451 - Screw Machine Products
Sales $1,000,000-$5,000,000
# of Employees 31
Plant Area (Sq.Ft.) 50,000
Annual Production 300,000 Pieces
Production Hrs. Annual 4,810
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,294 680,640 kWh $0.08
Electricity Demand $28,437 2,152 kW-months/year $13.21
Electricity Fees $8,819 - $ -
Natural Gas $11,277 1,694 MMBtu $6.66
TOTAL ENERGY COSTS $102,827
RECOMMENDED SAVINGS* $18,471 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,266
Cost:
-
$1,266 15,828 - - - - - - $1,266
15,828
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,837
Cost:
$2,064
$8,943 111,784 $3,685 279 - - $209 - $8,943
111,784
kWh
$3,685
279
kW-months/year
-
-
MMBtu
$209
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,106
Cost:
$875
$2,106 26,329 - - - - - - $2,106
26,329
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,422
Cost:
$650
- - $1,422 108 - - - - -
-
kWh
$1,422
108
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$525
Cost:
$462
$525 6,567 - - - - - - $525
6,567
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$314
Cost:
$510
$114 1,422 - - $200 30 - - $114
1,422
kWh
-
-
kW-months/year
$200
30
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,471
Cost:
$4,561
$12,954 161,930 $5,107 386 $200 30 $209 - $12,954
161,930
kWh
$5,107
386
kW-months/year
$200
30
MMBtu
$209
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost