IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2023
Principal Product Air Filtration Products and Media
NAICS 333912 - Air and Gas Compressor Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 155,000
Annual Production 100,000 Units
Production Hrs. Annual 4,290
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,666 1,852,961 kWh $0.04
Electricity Demand $66,769 6,214 kW-months/year $10.75
Electricity Fees $12,584 - $ -
Natural Gas $26,652 15,131 MMBtu $1.76
TOTAL ENERGY COSTS $174,672
RECOMMENDED SAVINGS* $59,012 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,031
Cost:
-
- - - - - - $6,031 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,031
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,557
Cost:
-
- - $3,557 331 - - - - -
-
kWh
$3,557
331
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,464
Cost:
-
$8,464 228,377 - - - - - - $8,464
228,377
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$603
Cost:
-
$336 9,060 $268 25 - - - - $336
9,060
kWh
$268
25
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,436
Cost:
$70
$972 26,276 $790 74 $(-327) (-179) - - $972
26,276
kWh
$790
74
kW-months/year
$(-327)
(-179)
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,000
Cost:
$102
$97 2,621 $39 4 - - $864 - $97
2,621
kWh
$39
4
kW-months/year
-
-
MMBtu
$864
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,355
Cost:
$156
- - - - $1,355 745 - - -
-
kWh
-
-
kW-months/year
$1,355
745
MMBtu
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$32,789
Cost:
$29,395
$10,612 286,810 $22,177 2,064 - - - - $10,612
286,810
kWh
$22,177
2,064
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$428
Cost:
$528
- - - - $428 243 - - -
-
kWh
-
-
kW-months/year
$428
243
MMBtu
-
-
$
10: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,531
Cost:
$2,041
- - - - $1,531 870 - - -
-
kWh
-
-
kW-months/year
$1,531
870
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,818
Cost:
$8,523
$1,818 49,127 - - - - - - $1,818
49,127
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$59,012
Cost:
$40,815
$22,299 602,271 $26,831 2,497 $2,987 1,678 $6,895 - $22,299
602,271
kWh
$26,831
2,497
kW-months/year
$2,987
1,678
MMBtu
$6,895
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost