IAC logo
IAC Assessment: SU0532
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0532
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2023
Principal Product Electronics and electronic components
NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 55,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,395 1,186,210 kWh $0.09
Electricity Demand $43,023 3,853 kW-months/year $11.17
Electricity Fees $2,089 - $ -
Natural Gas $23,152 24,973 MMBtu $0.93
Other Gas $205 24,973 MMBtu $0.01
TOTAL ENERGY COSTS $202,403
RECOMMENDED SAVINGS* $31,845 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7122 DISCONNECT BALLASTS Savings:
$6,186
Cost:
-
$4,575 48,160 $1,611 144 - - - - $4,575
48,160
kWh
$1,611
144
kW-months/year
-
-
MMBtu
-
-
$
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,177
Cost:
-
- - - - - - $1,177 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,177
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,864
Cost:
-
$1,864 19,617 - - - - - - $1,864
19,617
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,803
Cost:
-
- - - - - - $6,803 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,803
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,119
Cost:
$740
$3,119 32,827 - - - - - - $3,119
32,827
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,953
Cost:
$4,285
$6,163 64,872 $2,173 195 - - $1,617 - $6,163
64,872
kWh
$2,173
195
kW-months/year
-
-
MMBtu
$1,617
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$827
Cost:
$556
$827 8,704 - - - - - - $827
8,704
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,165
Cost:
$1,146
- - $1,165 104 - - - - -
-
kWh
$1,165
104
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$24
Cost:
$34
- - - - $24 26 - - -
-
kWh
-
-
kW-months/year
$24
26
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$728
Cost:
$1,343
$728 7,664 - - - - - - $728
7,664
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$31,845
Cost:
$8,104
$17,275 181,844 $4,949 443 $24 26 $9,597 - $17,275
181,844
kWh
$4,949
443
kW-months/year
$24
26
MMBtu
$9,597
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost