IAC logo
IAC Assessment: SU0543
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0543
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2023
Principal Product Custom made doors, some windows
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $1,000,000-$5,000,000
# of Employees 18
Plant Area (Sq.Ft.) 33,000
Annual Production 10,000 Units
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,824 581,420 kWh $0.08
Electricity Demand $40,016 3,163 kW-months/year $12.65
Electricity Fees $10,138 - $ -
TOTAL ENERGY COSTS $93,979
RECOMMENDED SAVINGS* $23,952 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,981
Cost:
-
- - $1,981 151 - - - - - - -
-
kWh
$1,981
151
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,892
Cost:
-
- - - - $1,892 - - - - - -
-
kWh
-
-
kW-months/year
$1,892
-
$
-
-
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$984
Cost:
-
$984 13,114 - - - - - - - - $984
13,114
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,574
Cost:
$129
$205 2,733 $47 4 - - - - $2,322 - $205
2,733
kWh
$47
4
kW-months/year
-
-
$
-
-
MMBtu
$2,322
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$853
Cost:
$45
- - - - - - - - $853 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$853
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,796
Cost:
$218
$1,796 23,947 - - - - - - - - $1,796
23,947
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,187
Cost:
$205
- - - - - - $1,187 207 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,187
207
MMBtu
-
-
$
08: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$10,295
Cost:
$12,000
$(-2,625) (-35,000) - - - - - - $12,920 - $(-2,625)
(-35,000)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$12,920
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$370
Cost:
$433
$370 4,929 - - - - - - - - $370
4,929
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,021
Cost:
$4,746
$1,246 16,609 $815 64 - - - - $(-40) - $1,246
16,609
kWh
$815
64
kW-months/year
-
-
$
-
-
MMBtu
$(-40)
-
$
TOTAL RECOMMENDED Savings:
$23,952
Cost:
$17,776
$1,975 26,331 $2,843 220 $1,892 - $1,187 207 $16,056 - $1,975
26,331
kWh
$2,843
220
kW-months/year
$1,892
-
$
$1,187
207
MMBtu
$16,056
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost