IAC logo
IAC Assessment: SU0548
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0548
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2024
Principal Product Biologics Drug Substance
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 479
Plant Area (Sq.Ft.) 4,390,446
Annual Production 40 Units
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,146,031 19,313,455 kWh $0.06
Electricity Demand $170,438 30,068 kW-months/year $5.67
Electricity Fees $104,868 - $ -
Natural Gas $856,815 209,808 MMBtu $4.08
TOTAL ENERGY COSTS $2,278,153
RECOMMENDED SAVINGS* $217,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Other Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Other Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$83,894
Cost:
-
- - - - - - - - - - $83,894 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$83,894
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$55,418
Cost:
-
- - - - - - - - - - $55,418 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$55,418
-
$
03: 2.7122 DISCONNECT BALLASTS Savings:
$8,148
Cost:
-
$7,201 122,044 $948 168 - - - - - - - - $7,201
122,044
kWh
$948
168
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$4,285
Cost:
-
- - $4,285 756 - - - - - - - - -
-
kWh
$4,285
756
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$15,307
Cost:
$1,250
$13,275 225,000 $5,951 1,050 $(-3,919) 957 - - - - - - $13,275
225,000
kWh
$5,951
1,050
kW-months/year
$(-3,919)
957
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,301
Cost:
$325
- - - - $1,301 319 - - - - - - -
-
kWh
-
-
kW-months/year
$1,301
319
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,334
Cost:
$2,970
$7,458 126,407 $1,156 204 - - - - - - $720 - $7,458
126,407
kWh
$1,156
204
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$720
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,902
Cost:
$5,628
- - - - $10,902 2,669 - - - - - - -
-
kWh
-
-
kW-months/year
$10,902
2,669
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,839
Cost:
$12,200
- - - - $14,839 3,637 - - - - - - -
-
kWh
-
-
kW-months/year
$14,839
3,637
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$14,025
Cost:
$12,000
$(-2,065) 35,000 - - - - $12,870 3,000 $3,220 1,000 - - $(-2,065)
35,000
kWh
-
-
kW-months/year
-
-
MMBtu
$12,870
3,000
MMBtu
$3,220
1,000
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$217,454
Cost:
$34,373
$25,869 508,451 $12,340 2,178 $23,123 7,582 $12,870 3,000 $3,220 1,000 $140,032 - $25,869
508,451
kWh
$12,340
2,178
kW-months/year
$23,123
7,582
MMBtu
$12,870
3,000
MMBtu
$3,220
1,000
MMBtu
$140,032
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Other Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Other Gas One-time Revenue or Avoided Cost