IAC logo
IAC Assessment: SU0555
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0555
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2024
Principal Product Structural Steel for Buildings & Bridges
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 57
Plant Area (Sq.Ft.) 72,000
Annual Production 3,118 Tons
Production Hrs. Annual 5,330
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,700 743,051 kWh $0.05
Electricity Demand $56,504 4,129 kW-months/year $13.68
Electricity Fees $10,790 - $ -
Natural Gas $8,980 1,379 MMBtu $6.51
LPG $26,874 798 MMBtu $33.69
Fuel Oil #1 $39,719 1,286 MMBtu $30.89
Other Gas $204 1 MMBtu $204.28
TOTAL ENERGY COSTS $183,772
RECOMMENDED SAVINGS* $115,164 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$923
Cost:
-
- - - - - - - - - - $923 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$923
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,613
Cost:
-
- - $2,613 191 - - - - - - - - -
-
kWh
$2,613
191
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,450
Cost:
-
$1,450 26,358 - - - - - - - - - - $1,450
26,358
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,049
Cost:
$70
$1,238 22,500 $1,436 105 $(-625) (-96) - - - - - - $1,238
22,500
kWh
$1,436
105
kW-months/year
$(-625)
(-96)
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,994
Cost:
$104
$1,994 36,251 - - - - - - - - - - $1,994
36,251
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,650
Cost:
$115
- - - - $1,650 253 - - - - - - -
-
kWh
-
-
kW-months/year
$1,650
253
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$362
Cost:
$128
$72 1,314 $25 2 - - - - - - $265 - $72
1,314
kWh
$25
2
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$265
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$600
Cost:
$292
- - - - $600 92 - - - - - - -
-
kWh
-
-
kW-months/year
$600
92
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$603
Cost:
$344
$603 10,967 - - - - - - - - - - $603
10,967
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$1,795
Cost:
$1,172
$1,795 32,633 - - - - - - - - - - $1,795
32,633
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$823
Cost:
$1,347
$500 9,094 $305 22 - - - - - - $18 - $500
9,094
kWh
$305
22
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$18
-
$
12: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$61,520
Cost:
$301,550
$(-5,073) (-92,243) - - - - $26,874 798 $39,719 1,286 - - $(-5,073)
(-92,243)
kWh
-
-
kW-months/year
-
-
MMBtu
$26,874
798
MMBtu
$39,719
1,286
MMBtu
-
-
$
13: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$101
Cost:
$498
$101 1,840 - - - - - - - - - - $101
1,840
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
14: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,140
Cost:
$35,125
$(-1,841) (-33,473) - - $8,981 1,379 - - - - - - $(-1,841)
(-33,473)
kWh
-
-
kW-months/year
$8,981
1,379
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
15: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$31,541
Cost:
$219,132
$31,541 573,480 - - - - - - - - - - $31,541
573,480
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$115,164
Cost:
$559,877
$32,380 588,721 $4,379 320 $10,606 1,628 $26,874 798 $39,719 1,286 $1,206 - $32,380
588,721
kWh
$4,379
320
kW-months/year
$10,606
1,628
MMBtu
$26,874
798
MMBtu
$39,719
1,286
MMBtu
$1,206
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #1 One-time Revenue or Avoided Cost