IAC logo
IAC Assessment: TA0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2001
Principal Product Leather Goods
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 236
Plant Area (Sq.Ft.) 150,000
Annual Production 2,400,000 Tons
Production Hrs. Annual 2,793
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,186 699,936 kWh $0.06
Electricity Demand $14,397 3,539 kW-months/year $4.07
Electricity Fees $6,393 - $ -
TOTAL ENERGY COSTS $64,976
RECOMMENDED SAVINGS* $103,062 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,472
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$89,376
Cost:
$40,000
- - - - - - $89,376 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$89,376
-
$
-
-
$
02: 2.8112 COMBINE UTILITY METERS Savings:
$9,444
Cost:
$19,000
- - - - - - - - $9,444 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$9,444
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,060
Cost:
$367
$2,060 30,568 - - - - - - - - $2,060
30,568
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,518
Cost:
-
$942 13,264 $576 66 - - - - - - $942
13,264
kWh
$576
66
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$450
Cost:
$35
- - - - $450 151,200 - - - - -
-
kWh
-
-
kW-months/year
$450
151,200
lb
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$114
Cost:
$124
$114 1,592 - - - - - - - - $114
1,592
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$100
Cost:
$3
$100 1,310 - - - - - - - - $100
1,310
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$103,062
Cost:
$59,529
$3,216 46,734 $576 66 $450 151,200 $89,376 - $9,444 - $3,216
46,734
kWh
$576
66
kW-months/year
$450
151,200
lb
$89,376
-
$
$9,444
-
$
TOTAL IMPLEMENTED Savings:
$13,472
Cost:
$19,402
$3,002 43,832 $576 66 $450 151,200 - - $9,444 - $3,002
43,832
kWh
$576
66
kW-months/year
$450
151,200
lb
-
-
$
$9,444
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes