IAC Assessment: TA0016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2001
Principal Product Missile Casing, Ordinance & Alum. For.
NAICS n/a
SIC 3769 - Space Vehicle Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 195,000
Annual Production 25,000,000 Tons
Production Hrs. Annual 6,448
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $735,046 23,235,120 kWh $0.03
Electricity Demand $172,995 54,401 kW-months/year $3.18
Electricity Fees $87,192 - $ -
Natural Gas $1,201,382 175,233 MMBtu $6.86
TOTAL ENERGY COSTS $2,196,615
RECOMMENDED SAVINGS* $469,224 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $465,114
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1224 REPLACE BOILER Savings:
$420,482
Cost:
$9,456
$(-19,798) (-464,256) $(-2,748) (-864) $443,028 64,417 $(-19,798)
(-464,256)
kWh
$(-2,748)
(-864)
kW-months/year
$443,028
64,417
MMBtu
02: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$15,055
Cost:
$600
$13,720 321,700 $1,335 420 - - $13,720
321,700
kWh
$1,335
420
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,585
Cost:
$2,910
$13,585 318,580 - - - - $13,585
318,580
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,090
Cost:
$1,200
$11,090 260,090 - - - - $11,090
260,090
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2514 COVER OPEN TANKS Savings:
$2,000
Cost:
$3,900
$2,000 46,857 - - - - $2,000
46,857
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,920
Cost:
$54
$1,920 45,075 - - - - $1,920
45,075
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,696
Cost:
$225
$1,362 31,938 $334 105 - - $1,362
31,938
kWh
$334
105
kW-months/year
-
-
MMBtu
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,600
Cost:
-
$1,380 32,488 $220 69 - - $1,380
32,488
kWh
$220
69
kW-months/year
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,032
Cost:
$320
$1,032 24,200 - - - - $1,032
24,200
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7122 DISCONNECT BALLASTS Savings:
$510
Cost:
$982
$450 10,562 $60 20 - - $450
10,562
kWh
$60
20
kW-months/year
-
-
MMBtu
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$254
Cost:
$542
$230 5,396 $24 7 - - $230
5,396
kWh
$24
7
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$469,224
Cost:
$20,189
$26,971 632,630 $(-775) (-243) $443,028 64,417 $26,971
632,630
kWh
$(-775)
(-243)
kW-months/year
$443,028
64,417
MMBtu
TOTAL IMPLEMENTED Savings:
$465,114
Cost:
$15,307
$23,141 542,723 $(-1,055) (-332) $443,028 64,417 $23,141
542,723
kWh
$(-1,055)
(-332)
kW-months/year
$443,028
64,417
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas