IAC logo
IAC Assessment: TA0025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2002
Principal Product Auto Alternators and Brake Pads
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 174
Plant Area (Sq.Ft.) 49,000
Annual Production 800,000 Pieces
Production Hrs. Annual 4,518
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,403 1,450,043 kWh $0.04
Electricity Demand $41,575 4,845 kW-months/year $8.58
Electricity Fees $9,325 - $ -
Natural Gas $56,364 7,212 MMBtu $7.82
TOTAL ENERGY COSTS $170,667
RECOMMENDED SAVINGS* $30,541 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,307
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$11,011
Cost:
$3,255
- - - - - - $11,011 1,409 -
-
kWh
-
-
kW-months/year
-
-
$
$11,011
1,409
MMBtu
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,422
Cost:
-
- - - - $8,422 - - - -
-
kWh
-
-
kW-months/year
$8,422
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,485
Cost:
$6,700
$2,961 82,101 $2,524 205 - - - - $2,961
82,101
kWh
$2,524
205
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,770
Cost:
$476
- - - - - - $2,770 354 -
-
kWh
-
-
kW-months/year
-
-
$
$2,770
354
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$972
Cost:
$212
$972 26,930 - - - - - - $972
26,930
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$912
Cost:
-
$912 25,278 - - - - - - $912
25,278
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$400
Cost:
-
$200 5,634 $200 17 - - - - $200
5,634
kWh
$200
17
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$307
Cost:
$338
$307 8,510 - - - - - - $307
8,510
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7122 DISCONNECT BALLASTS Savings:
$262
Cost:
$49
$137 3,800 $125 10 - - - - $137
3,800
kWh
$125
10
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,541
Cost:
$11,030
$5,489 152,253 $2,849 232 $8,422 - $13,781 1,763 $5,489
152,253
kWh
$2,849
232
kW-months/year
$8,422
-
$
$13,781
1,763
MMBtu
TOTAL IMPLEMENTED Savings:
$29,307
Cost:
$10,769
$4,380 121,523 $2,724 222 $8,422 - $13,781 1,763 $4,380
121,523
kWh
$2,724
222
kW-months/year
$8,422
-
$
$13,781
1,763
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas