IAC logo
IAC Assessment: TA0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 239,000
Annual Production 2,147,483,647 Thousand Feet
Production Hrs. Annual 6,264
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,712 4,401,256 kWh $0.04
Electricity Demand $68,448 8,388 kW-months/year $8.16
Electricity Fees $24,252 - $ -
Natural Gas $230,836 50,994 MMBtu $4.53
TOTAL ENERGY COSTS $481,248
RECOMMENDED SAVINGS* $37,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,415
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$16,500
Cost:
$31,000
- - - - $16,500 3,900 -
-
kWh
-
-
kW-months/year
$16,500
3,900
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$11,090
Cost:
$480
- - - - $11,090 2,263 -
-
kWh
-
-
kW-months/year
$11,090
2,263
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,000
Cost:
$840
$5,000 162,634 - - - - $5,000
162,634
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,520
Cost:
$1,200
- - - - $4,520 1,070 -
-
kWh
-
-
kW-months/year
$4,520
1,070
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$390
Cost:
$180
$390 12,650 - - - - $390
12,650
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$315
Cost:
-
$180 5,763 $135 11 - - $180
5,763
kWh
$135
11
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$100
Cost:
$200
$60 1,962 $40 3 - - $60
1,962
kWh
$40
3
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$37,915
Cost:
$33,900
$5,630 183,009 $175 14 $32,110 7,233 $5,630
183,009
kWh
$175
14
kW-months/year
$32,110
7,233
MMBtu
TOTAL IMPLEMENTED Savings:
$21,415
Cost:
$2,900
$5,630 183,009 $175 14 $15,610 3,333 $5,630
183,009
kWh
$175
14
kW-months/year
$15,610
3,333
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas