IAC Assessment: TA0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2002
Principal Product Wire and Metal Display Products
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 300,000 Pieces
Production Hrs. Annual 2,570
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,075 1,020,567 kWh $0.06
Electricity Demand $16,358 5,486 kW-months/year $2.98
Electricity Fees $19,522 - $ -
Natural Gas $31,551 2,984 MMBtu $10.57
TOTAL ENERGY COSTS $134,506
RECOMMENDED SAVINGS* $33,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,623
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$19,125
Cost:
$7,500
- - - - - - - - $19,125 875,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$19,125
875,000
Tgal
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,660
Cost:
-
- - - - $6,660 - - - - - -
-
kWh
-
-
kW-months/year
$6,660
-
$
-
-
MMBtu
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,280
Cost:
$135
$2,630 40,970 $650 190 - - - - - - $2,630
40,970
kWh
$650
190
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,244
Cost:
$5
$2,244 34,938 - - - - - - - - $2,244
34,938
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$980
Cost:
$30
$790 12,336 $190 57 - - - - - - $790
12,336
kWh
$190
57
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$640
Cost:
-
$640 9,970 - - - - - - - - $640
9,970
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$296
$190 2,940 $14 4 - - - - - - $190
2,940
kWh
$14
4
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$110
Cost:
$100
- - - - - - $110 11 - - -
-
kWh
-
-
kW-months/year
-
-
$
$110
11
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$33,243
Cost:
$8,066
$6,494 101,154 $854 251 $6,660 - $110 11 $19,125 875,000 $6,494
101,154
kWh
$854
251
kW-months/year
$6,660
-
$
$110
11
MMBtu
$19,125
875,000
Tgal
TOTAL IMPLEMENTED Savings:
$31,623
Cost:
$8,036
$5,064 78,848 $664 194 $6,660 - $110 11 $19,125 875,000 $5,064
78,848
kWh
$664
194
kW-months/year
$6,660
-
$
$110
11
MMBtu
$19,125
875,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal