Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2002
Principal Product Ready Mix Concrete
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 42,900
Annual Production 4,170 Thousand Feet
Production Hrs. Annual 2,522
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,499 376,098 kWh $0.06
Electricity Demand $10,019 1,567 kW-months/year $6.39
Electricity Fees $5,709 - $ -
Natural Gas $6,211 1,017 MMBtu $6.11
Fuel Oil #1 $28,241 37,209 MMBtu $0.76
TOTAL ENERGY COSTS $73,679
RECOMMENDED SAVINGS* $18,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,704
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Water Consumption Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$11,200
Cost:
$12,425
- - - - - - - - $11,200 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$11,200
-
Tgal
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,952
Cost:
-
- - - - $2,952 - - - - - -
-
kWh
-
-
kW-months/year
$2,952
-
$
-
-
MMBtu
-
-
Tgal
03: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$2,552
Cost:
-
- - - - - - $2,552 3,382 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,552
3,382
MMBtu
-
-
Tgal
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,210
Cost:
-
$1,210 41,000 - - - - - - - - $1,210
41,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$181
Cost:
$90
$62 2,115 $119 10 - - - - - - $62
2,115
kWh
$119
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$140
Cost:
-
$45 1,580 $95 8 - - - - - - $45
1,580
kWh
$95
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$110
Cost:
$130
$110 3,740 - - - - - - - - $110
3,740
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$18,345
Cost:
$12,645
$1,427 48,435 $214 18 $2,952 - $2,552 3,382 $11,200 - $1,427
48,435
kWh
$214
18
kW-months/year
$2,952
-
$
$2,552
3,382
MMBtu
$11,200
-
Tgal
TOTAL IMPLEMENTED Savings:
$16,704
Cost:
$12,425
- - - - $2,952 - $2,552 3,382 $11,200 - -
-
kWh
-
-
kW-months/year
$2,952
-
$
$2,552
3,382
MMBtu
$11,200
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Water Consumption Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Water Consumption