IAC logo
IAC Assessment: TA0045
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0045
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Custom Motorcycles
NAICS 336991 - Motorcycle, Bicycle, and Parts Manufacturing
SIC 3751 - Motorcycles, Bicycles, And Parts
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 200,000
Annual Production 1,600 Pieces
Production Hrs. Annual 6,072
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,456 1,713,300 kWh $0.05
Electricity Demand $32,398 4,156 kW-months/year $7.80
Electricity Fees $3,904 - $ -
Natural Gas $19,956 3,996 MMBtu $4.99
TOTAL ENERGY COSTS $184,714
RECOMMENDED SAVINGS* $35,845 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,125
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ $
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$27,670
Cost:
$800
- - - - $25,000 50,000 $(-2,530) - $5,200 - - - -
-
kWh
-
-
kW-months/year
$25,000
50,000
Tgal
$(-2,530)
-
$
$5,200
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,140
Cost:
$200
$1,830 55,700 $1,310 110 - - - - - - - - $1,830
55,700
kWh
$1,310
110
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,990
Cost:
-
- - - - - - - - - - $1,990 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
$1,990
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,740
Cost:
$3,230
$680 20,687 $1,060 89 - - - - - - - - $680
20,687
kWh
$1,060
89
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$370
Cost:
-
$370 11,510 - - - - - - - - - - $370
11,510
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$520
Cost:
$145
$190 5,885 $330 12 - - - - - - - - $190
5,885
kWh
$330
12
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$215
Cost:
$445
$145 4,415 $70 6 - - - - - - - - $145
4,415
kWh
$70
6
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$200
Cost:
-
$200 6,135 - - - - - - - - - - $200
6,135
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$35,845
Cost:
$4,820
$3,415 104,332 $2,770 217 $25,000 50,000 $(-2,530) - $5,200 - $1,990 - $3,415
104,332
kWh
$2,770
217
kW-months/year
$25,000
50,000
Tgal
$(-2,530)
-
$
$5,200
-
$
$1,990
-
$
TOTAL IMPLEMENTED Savings:
$35,125
Cost:
$4,675
$3,025 92,312 $2,440 205 $25,000 50,000 $(-2,530) - $5,200 - $1,990 - $3,025
92,312
kWh
$2,440
205
kW-months/year
$25,000
50,000
Tgal
$(-2,530)
-
$
$5,200
-
$
$1,990
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Primary Raw Material