IAC Assessment: TA0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Snack Foods
NAICS 311423 - Dried and Dehydrated Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 65,000
Annual Production 26,000,000 Pounds
Production Hrs. Annual 6,336
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,995 2,924,994 kWh $0.04
Electricity Demand $31,482 7,875 kW-months/year $4.00
Electricity Fees $3,819 - $ -
Natural Gas $709,917 198,204 MMBtu $3.58
TOTAL ENERGY COSTS $5,651,455
RECOMMENDED SAVINGS* $512,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,789
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4325 UPGRADE CONVEYORS Savings:
$430,950
Cost:
$202,900
- - - - - - - - $430,950 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$430,950
-
$
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$47,100
Cost:
$5,202
- - - - $47,100 13,157 - - - - -
-
kWh
-
-
kW-months/year
$47,100
13,157
MMBtu
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,258
Cost:
$8,100
$6,258 141,926 - - - - - - - - $6,258
141,926
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$13,150
Cost:
-
- - - - - - - - $13,150 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$13,150
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$5,795
Cost:
$11,200
$5,795 131,407 - - - - - - - - $5,795
131,407
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,492
Cost:
-
- - - - - - $4,492 6,418 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,492
6,418
Tgal
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,570
Cost:
-
$2,190 49,724 $380 95 - - - - - - $2,190
49,724
kWh
$380
95
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,676
Cost:
-
$1,676 38,000 - - - - - - - - $1,676
38,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$390
Cost:
-
$390 8,921 - 17 - - - - - - $390
8,921
kWh
-
17
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$390
Cost:
-
$390 8,921 - 17 - - - - - - $390
8,921
kWh
-
17
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$512,771
Cost:
$227,402
$16,699 378,899 $380 129 $47,100 13,157 $4,492 6,418 $444,100 - $16,699
378,899
kWh
$380
129
kW-months/year
$47,100
13,157
MMBtu
$4,492
6,418
Tgal
$444,100
-
$
TOTAL IMPLEMENTED Savings:
$63,789
Cost:
$24,502
$16,309 369,978 $380 112 $47,100 13,157 - - - - $16,309
369,978
kWh
$380
112
kW-months/year
$47,100
13,157
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes