IAC logo
IAC Assessment: TA0054
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0054
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Metal Electrical Enclosures and Boxes
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 130,000
Annual Production 300,000 Pieces
Production Hrs. Annual 4,544
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,871 1,203,917 kWh $0.05
Electricity Demand $37,085 4,958 kW-months/year $7.48
Electricity Fees $340 - $ -
Natural Gas $46,433 8,301 MMBtu $5.59
TOTAL ENERGY COSTS $144,729
RECOMMENDED SAVINGS* $1,005,354 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,447
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.7210 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$1,000,000
Cost:
$25,150
- - - - - - $1,000,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,000,000
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,893
Cost:
-
$1,378 27,264 $515 72 - - - - $1,378
27,264
kWh
$515
72
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$1,215
Cost:
-
- - - - $1,215 217 - - -
-
kWh
-
-
kW-months/year
$1,215
217
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$907
Cost:
$54
$657 13,000 $250 35 - - - - $657
13,000
kWh
$250
35
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$757
Cost:
$1,550
$442 8,744 $315 44 - - - - $442
8,744
kWh
$315
44
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$316
Cost:
-
$223 4,412 $93 13 - - - - $223
4,412
kWh
$93
13
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$266
Cost:
$444
$223 4,415 $43 6 - - - - $223
4,415
kWh
$43
6
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,005,354
Cost:
$27,198
$2,923 57,835 $1,216 170 $1,215 217 $1,000,000 - $2,923
57,835
kWh
$1,216
170
kW-months/year
$1,215
217
MMBtu
$1,000,000
-
$
TOTAL IMPLEMENTED Savings:
$4,447
Cost:
$1,994
$2,266 44,835 $966 135 $1,215 217 - - $2,266
44,835
kWh
$966
135
kW-months/year
$1,215
217
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes