Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas, Arlington |
---|---|
Assessment Year | 2003 |
Principal Product | Refigeration Components and Chemicals |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 600,000 Pieces |
Production Hrs. Annual | 3,258 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $123,410 | 2,928,707 | kWh | $0.04 |
Electricity Demand | $41,412 | 9,039 | kW-months/year | $4.58 |
Natural Gas | $63,057 | 8,037 | MMBtu | $7.85 |
TOTAL ENERGY COSTS | $233,179 | |||
RECOMMENDED SAVINGS* | $23,654 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,250 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS |
Savings: $15,460 Cost: - |
- | - | - | - | $15,460 | 1,971 | - | - | - | - |
- - kWh |
- - kW-months/year |
$15,460 1,971 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,000 Cost: $400 |
$2,180 | 53,000 | $820 | 195 | - | - | - | - | - | - |
$2,180 53,000 kWh |
$820 195 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $2,500 Cost: $100 |
$2,500 | 60,500 | - | - | - | - | - | - | - | - |
$2,500 60,500 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,800 Cost: - |
- | - | - | - | - | - | $1,800 | 100 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,800 100 Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $335 Cost: - |
$245 | 5,950 | $90 | 21 | - | - | - | - | - | - |
$245 5,950 kWh |
$90 21 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $190 Cost: $123 |
$190 | 4,635 | - | - | - | - | - | - | - | - |
$190 4,635 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $155 Cost: - |
- | - | - | - | - | - | - | - | $155 | 3,120 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$155 3,120 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $214 Cost: $120 |
$90 | 2,173 | $124 | 8 | - | - | - | - | - | - |
$90 2,173 kWh |
$124 8 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,654 Cost: $743 |
$5,205 | 126,258 | $1,034 | 224 | $15,460 | 1,971 | $1,800 | 100 | $155 | 3,120 | $5,205 126,258 kWh |
$1,034 224 kW-months/year |
$15,460 1,971 MMBtu |
$1,800 100 Tgal |
$155 3,120 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,250 Cost: $500 |
$4,925 | 119,450 | $910 | 216 | $15,460 | 1,971 | $1,800 | 100 | $155 | 3,120 | $4,925 119,450 kWh |
$910 216 kW-months/year |
$15,460 1,971 MMBtu |
$1,800 100 Tgal |
$155 3,120 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) |