IAC logo
IAC Assessment: TA0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Adhesives and Sealants
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 89,000
Annual Production 8,000 Thousand Gallons
Production Hrs. Annual 4,752
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,103 4,321,689 kWh $0.05
Electricity Demand $109,060 15,338 kW-months/year $7.11
Electricity Fees $27,860 - $ -
Natural Gas $75,477 11,689 MMBtu $6.46
TOTAL ENERGY COSTS $431,500
RECOMMENDED SAVINGS* $81,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,494
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8112 COMBINE UTILITY METERS Savings:
$44,572
Cost:
$57,200
$44,572 - - - - - - - $44,572
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$26,157
Cost:
-
- - - - $26,157 - - - -
-
kWh
-
-
kW-months/year
$26,157
-
$
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,420
Cost:
$13,085
$5,200 90,000 - - - - $2,220 344 $5,200
90,000
kWh
-
-
kW-months/year
-
-
$
$2,220
344
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,035
Cost:
$1,936
$560 9,677 $475 51 - - - - $560
9,677
kWh
$475
51
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$850
Cost:
-
$850 14,660 - - - - - - $850
14,660
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$780
Cost:
$144
$550 9,584 $230 25 - - - - $550
9,584
kWh
$230
25
kW-months/year
-
-
$
-
-
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$390
Cost:
$100
- - - - - - $390 60 -
-
kWh
-
-
kW-months/year
-
-
$
$390
60
MMBtu
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$140
Cost:
-
$140 2,430 - - - - - - $140
2,430
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$81,344
Cost:
$72,465
$51,872 126,351 $705 76 $26,157 - $2,610 404 $51,872
126,351
kWh
$705
76
kW-months/year
$26,157
-
$
$2,610
404
MMBtu
TOTAL IMPLEMENTED Savings:
$80,494
Cost:
$72,465
$51,022 111,691 $705 76 $26,157 - $2,610 404 $51,022
111,691
kWh
$705
76
kW-months/year
$26,157
-
$
$2,610
404
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas