Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas, Arlington |
---|---|
Assessment Year | 2003 |
Principal Product | Fabrics and Cushions |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3724 - Aircraft Engines And Engine Parts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 4,000 Thousand Feet |
Production Hrs. Annual | 2,150 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $37,755 | 698,946 | kWh | $0.05 |
Electricity Demand | $11,520 | 3,600 | kW-months/year | $3.20 |
Electricity Fees | $2,270 | - | $ | - |
TOTAL ENERGY COSTS | $51,545 | |||
RECOMMENDED SAVINGS* | $37,345 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,734 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $29,101 Cost: $28,080 |
- | - | - | - | - | - | $29,101 | - |
- - kWh |
- - $ |
- - lb |
$29,101 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS |
Savings: $2,218 Cost: - |
- | - | $2,218 | - | - | - | - | - |
- - kWh |
$2,218 - $ |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,854 Cost: - |
$1,854 | 34,340 | - | - | - | - | - | - |
$1,854 34,340 kWh |
- - $ |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,240 Cost: $3,740 |
$1,240 | 22,560 | - | - | - | - | - | - |
$1,240 22,560 kWh |
- - $ |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $893 Cost: - |
$893 | 16,539 | - | - | - | - | - | - |
$893 16,539 kWh |
- - $ |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $630 Cost: $210 |
- | - | - | - | $630 | - | - | - |
- - kWh |
- - $ |
$630 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $668 Cost: - |
$668 | 12,374 | - | - | - | - | - | - |
$668 12,374 kWh |
- - $ |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $557 Cost: - |
$557 | 10,320 | - | - | - | - | - | - |
$557 10,320 kWh |
- - $ |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $184 Cost: $270 |
- | - | - | - | $184 | - | - | - |
- - kWh |
- - $ |
$184 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,345 Cost: $32,300 |
$5,212 | 96,133 | $2,218 | - | $814 | - | $29,101 | - | $5,212 96,133 kWh |
$2,218 - $ |
$814 - lb |
$29,101 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,734 Cost: $28,080 |
$3,415 | 63,253 | $2,218 | - | - | - | $29,101 | - | $3,415 63,253 kWh |
$2,218 - $ |
- - lb |
$29,101 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Fees | Solid Waste (non-haz) | Ancillary Material Cost |