IAC logo
IAC Assessment: TA0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Machine Drilling Equipment
NAICS 333515 - Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3532 - Mining Machinery
Sales $50,000,000-$100,000,000
# of Employees 178
Plant Area (Sq.Ft.) 200,000
Annual Production 80 Pieces
Production Hrs. Annual 4,463
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,826 5,951,239 kWh $0.05
Electricity Demand $84,200 14,788 kW-months/year $5.69
Electricity Fees $23,195 - $ -
Natural Gas $128,692 18,744 MMBtu $6.87
TOTAL ENERGY COSTS $512,913
RECOMMENDED SAVINGS* $71,845 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,990
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$19,270
Cost:
$(-19,270)
- - - - $19,270 - - - - - -
-
kWh
-
-
kW-months/year
$19,270
-
$
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,210
Cost:
$400
$7,450 155,312 $1,760 417 - - - - - - $7,450
155,312
kWh
$1,760
417
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,675
Cost:
-
- - - - - - $8,675 1,264 - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,675
1,264
MMBtu
-
-
$
04: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$7,485
Cost:
$480
$6,050 126,200 $1,435 339 - - - - - - $6,050
126,200
kWh
$1,435
339
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$6,185
Cost:
$485
$5,000 104,300 $1,185 280 - - - - - - $5,000
104,300
kWh
$1,185
280
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,970
Cost:
$13,700
$5,720 109,896 $1,250 295 - - - - - - $5,720
109,896
kWh
$1,250
295
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,240
Cost:
-
$4,240 88,430 - - - - - - - - $4,240
88,430
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$3,960
Cost:
$2,510
- - - - - - - - $3,960 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,960
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,910
Cost:
-
$2,350 49,057 $560 132 - - - - - - $2,350
49,057
kWh
$560
132
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,940
Cost:
$200
$2,350 49,025 $590 139 - - - - - - $2,350
49,025
kWh
$590
139
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$71,845
Cost:
$(-1,495)
$33,160 682,220 $6,780 1,602 $19,270 - $8,675 1,264 $3,960 - $33,160
682,220
kWh
$6,780
1,602
kW-months/year
$19,270
-
$
$8,675
1,264
MMBtu
$3,960
-
$
TOTAL IMPLEMENTED Savings:
$46,990
Cost:
$(-15,595)
$19,990 417,012 $3,770 890 $19,270 - - - $3,960 - $19,990
417,012
kWh
$3,770
890
kW-months/year
$19,270
-
$
-
-
MMBtu
$3,960
-
$