Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas, Arlington |
---|---|
Assessment Year | 2004 |
Principal Product | Institutional Furniture Manufacturing |
NAICS | 337127 - Institutional Furniture Manufacturing |
SIC | 2541 - Wood Partitions And Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 486,000 |
Annual Production | 500 Pieces |
Production Hrs. Annual | 4,328 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $129,497 | 2,398,960 | kWh | $0.05 |
Electricity Demand | $30,007 | 6,885 | kW-months/year | $4.36 |
Electricity Fees | $456 | - | $ | - |
Natural Gas | $25,106 | 3,945 | MMBtu | $6.36 |
TOTAL ENERGY COSTS | $185,066 | |||
RECOMMENDED SAVINGS* | $49,720 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,945 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $25,095 Cost: $4,666 |
$8,685 | 143,930 | $1,710 | 400 | $14,700 | 1,357 | - | - |
$8,685 143,930 kWh |
$1,710 400 kW-months/year |
$14,700 1,357 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $13,600 Cost: - |
- | - | - | - | - | - | $13,600 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$13,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $7,680 Cost: $150 |
- | - | - | - | $7,680 | 708 | - | - |
- - kWh |
- - kW-months/year |
$7,680 708 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,360 Cost: $190 |
$2,020 | 33,500 | $340 | 79 | - | - | - | - |
$2,020 33,500 kWh |
$340 79 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING |
Savings: $775 Cost: - |
$390 | 6,514 | $385 | 90 | - | - | - | - |
$390 6,514 kWh |
$385 90 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $210 Cost: $320 |
$192 | 3,189 | $18 | 4 | - | - | - | - |
$192 3,189 kWh |
$18 4 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,720 Cost: $5,326 |
$11,287 | 187,133 | $2,453 | 573 | $22,380 | 2,065 | $13,600 | - | $11,287 187,133 kWh |
$2,453 573 kW-months/year |
$22,380 2,065 MMBtu |
$13,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,945 Cost: $510 |
$2,602 | 43,203 | $743 | 173 | - | - | $13,600 | - | $2,602 43,203 kWh |
$743 173 kW-months/year |
- - MMBtu |
$13,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |