IAC logo
IAC Assessment: TA0077
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0077
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2004
Principal Product Coated Laminated Paper
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 32,600
Annual Production 1 Thousand Feet
Production Hrs. Annual 4,345
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,403 870,912 kWh $0.06
Electricity Demand $23,472 3,137 kW-months/year $7.48
Electricity Fees $535 - $ -
TOTAL ENERGY COSTS $86,030
RECOMMENDED SAVINGS* $67,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Primary Product Electricity Usage Electricity Demand Water Disposal Primary Product
$ kWh $ kW-months/year $ Tgal $ $
01: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$42,000
Cost:
-
- - - - - - $42,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$42,000
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,970
Cost:
-
$10,970 - - - - - - - $10,970
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,104
Cost:
$8,650
$6,130 132,900 $2,974 255 - - - - $6,130
132,900
kWh
$2,974
255
kW-months/year
-
-
Tgal
-
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,087
Cost:
$1,685
- - - - $4,087 413 - - -
-
kWh
-
-
kW-months/year
$4,087
413
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,474
Cost:
$840
$1,474 31,954 - - - - - - $1,474
31,954
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$67,635
Cost:
$11,175
$18,574 164,854 $2,974 255 $4,087 413 $42,000 - $18,574
164,854
kWh
$2,974
255
kW-months/year
$4,087
413
Tgal
$42,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Primary Product Electricity Usage Electricity Demand Water Disposal Primary Product