IAC Assessment: TA0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2004
Principal Product Remanufactured Engines
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 230,000
Annual Production 40,000 Pieces
Production Hrs. Annual 4,572
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $235,959 4,574,626 kWh $0.05
Electricity Demand $84,902 18,365 kW-months/year $4.62
Electricity Fees $6,511 - $ -
Natural Gas $108,775 15,628 MMBtu $6.96
TOTAL ENERGY COSTS $436,147
RECOMMENDED SAVINGS* $62,577 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$38,280
Cost:
$720
$30,050 604,720 $8,230 1,587 $30,050
604,720
kWh
$8,230
1,587
kW-months/year
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$15,200
Cost:
$7,680
$15,200 305,890 - - $15,200
305,890
kWh
-
-
kW-months/year
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,240
Cost:
$300
$3,900 78,580 $1,340 258 $3,900
78,580
kWh
$1,340
258
kW-months/year
04: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$1,490
Cost:
$200
$1,160 23,330 $330 64 $1,160
23,330
kWh
$330
64
kW-months/year
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,450
Cost:
$720
$1,450 29,110 - - $1,450
29,110
kWh
-
-
kW-months/year
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$637
Cost:
-
$107 2,155 $530 102 $107
2,155
kWh
$530
102
kW-months/year
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$280
Cost:
-
- - $280 54 -
-
kWh
$280
54
kW-months/year
TOTAL RECOMMENDED Savings:
$62,577
Cost:
$9,620
$51,867 1,043,785 $10,710 2,065 $51,867
1,043,785
kWh
$10,710
2,065
kW-months/year
TOTAL IMPLEMENTED Savings:
$41,500
Cost:
$1,640
$32,660 657,160 $8,840 1,705 $32,660
657,160
kWh
$8,840
1,705
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand