IAC logo
IAC Assessment: TA0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2005
Principal Product Injection molded plastics
NAICS 333511 - Industrial Mold Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 63,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,408
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $356,037 4,785,200 kWh $0.07
Electricity Demand $87,111 11,960 kW-months/year $7.28
TOTAL ENERGY COSTS $443,148
RECOMMENDED SAVINGS* $32,628 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,168
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$12,460
Cost:
$8,170
$12,460 165,050 - - $12,460
165,050
kWh
-
-
kW-months/year
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$1,365
Cost:
$2,620
$1,365 18,067 - - $1,365
18,067
kWh
-
-
kW-months/year
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$14,113
Cost:
-
$14,113 186,925 - - $14,113
186,925
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,990
Cost:
-
$3,390 44,856 $600 84 $3,390
44,856
kWh
$600
84
kW-months/year
05: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$700
Cost:
$1,070
$700 9,320 - - $700
9,320
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$32,628
Cost:
$11,860
$32,028 424,218 $600 84 $32,028
424,218
kWh
$600
84
kW-months/year
TOTAL IMPLEMENTED Savings:
$20,168
Cost:
$3,690
$19,568 259,168 $600 84 $19,568
259,168
kWh
$600
84
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand