Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2005
Principal Product Aircraft parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 100,000
Annual Production 230,000 Pieces
Production Hrs. Annual 7,296
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $427,394 6,554,068 kWh $0.07
Electricity Demand $93,304 13,709 kW-months/year $6.81
Electricity Fees $23,717 - $ -
Natural Gas $39,834 4,601 MMBtu $8.66
TOTAL ENERGY COSTS $584,249
RECOMMENDED SAVINGS* $64,399 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,999
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$28,674
Cost:
$(-14,337)
- - - - $28,674 - -
-
kWh
-
-
kW-months/year
$28,674
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,775
Cost:
$175
$4,200 67,055 $575 110 - - $4,200
67,055
kWh
$575
110
kW-months/year
-
-
$
03: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$4,400
Cost:
$185
$4,400 70,166 - - - - $4,400
70,166
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,400
Cost:
$12,395
$22,340 356,336 $3,060 586 - - $22,340
356,336
kWh
$3,060
586
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,150
Cost:
$100
$1,150 18,385 - - - - $1,150
18,385
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$64,399
Cost:
$(-1,482)
$32,090 511,942 $3,635 696 $28,674 - $32,090
511,942
kWh
$3,635
696
kW-months/year
$28,674
-
$
TOTAL IMPLEMENTED Savings:
$59,999
Cost:
$(-1,667)
$27,690 441,776 $3,635 696 $28,674 - $27,690
441,776
kWh
$3,635
696
kW-months/year
$28,674
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees