IAC logo
IAC Assessment: TA0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2006
Principal Product Fabricated Rebars
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3449 - Miscellaneous Metal Work
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 12,500
Annual Production 36,000 Tons
Production Hrs. Annual 3,612
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,516 2,478 kWh $6.26
Electricity Demand $3,713 415 kW-months/year $8.95
Natural Gas $5,265 1,067 MMBtu $4.93
TOTAL ENERGY COSTS $24,494
RECOMMENDED SAVINGS* $35,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,310
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,410
Cost:
$625
$3,910 15,842 $1,500 53 - - $3,910
15,842
kWh
$1,500
53
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,256
Cost:
-
$1,858 23,839 $398 7 - - $1,858
23,839
kWh
$398
7
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$90
Cost:
$135
$90 1,160 - - - - $90
1,160
kWh
-
-
kW-months/year
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$20,890
Cost:
-
$20,890 268,585 - - - - $20,890
268,585
kWh
-
-
kW-months/year
-
-
$
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$5,050
Cost:
$6,882
$5,050 64,812 - - - - $5,050
64,812
kWh
-
-
kW-months/year
-
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,664
Cost:
$832
- - - - $1,664 - -
-
kWh
-
-
kW-months/year
$1,664
-
$
TOTAL RECOMMENDED Savings:
$35,360
Cost:
$8,474
$31,798 374,238 $1,898 60 $1,664 - $31,798
374,238
kWh
$1,898
60
kW-months/year
$1,664
-
$
TOTAL IMPLEMENTED Savings:
$30,310
Cost:
$1,592
$26,748 309,426 $1,898 60 $1,664 - $26,748
309,426
kWh
$1,898
60
kW-months/year
$1,664
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees