IAC logo
IAC Assessment: TN0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1982
Principal Product MEN'S SUIT COATS
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $50,000,000-$100,000,000
# of Employees 750
Plant Area (Sq.Ft.) 0
Annual Production 468,000 Pieces
Production Hrs. Annual 3,120
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $309,535 8,276,671 kWh $0.04
Natural Gas $151,802 57,300 MMBtu $2.65
TOTAL ENERGY COSTS $461,337
RECOMMENDED SAVINGS* $10,854 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,980
Cost:
-
- - $4,980 1,880 -
-
kWh
$4,980
1,880
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,127
Cost:
-
$3,127 120,164 - - $3,127
120,164
kWh
-
-
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$2,747
Cost:
$400
- - $2,747 1,037 -
-
kWh
$2,747
1,037
MMBtu
TOTAL RECOMMENDED Savings:
$10,854
Cost:
$400
$3,127 120,164 $7,727 2,917 $3,127
120,164
kWh
$7,727
2,917
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas