IAC Assessment: TN0284
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0284
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1986
Principal Product HAMBURGER & HOT DOG BUNS
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 103
Plant Area (Sq.Ft.) 0
Annual Production 25,000,000 Pounds
Production Hrs. Annual 7,280
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,471 2,432,884 kWh $0.05
Natural Gas $160,152 28,168 MMBtu $5.69
TOTAL ENERGY COSTS $273,623
RECOMMENDED SAVINGS* $18,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,920
#|Description Savings
Cost
Status Natural Gas Natural Gas
$ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$8,573
Cost:
$1,383
$8,573 1,504 $8,573
1,504
MMBtu
02: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$8,026
Cost:
$14,300
$8,026 1,408 $8,026
1,408
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,112
Cost:
$195
$1,112 195 $1,112
195
MMBtu
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$707
Cost:
$104
$707 124 $707
124
MMBtu
05: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$422
Cost:
$800
$422 74 $422
74
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$80
Cost:
$300
$80 14 $80
14
MMBtu
TOTAL RECOMMENDED Savings:
$18,920
Cost:
$17,082
$18,920 3,319 $18,920
3,319
MMBtu
TOTAL IMPLEMENTED Savings:
$18,920
Cost:
$17,082
$18,920 3,319 $18,920
3,319
MMBtu
Savings
Cost
$ MMBtu
Natural Gas Natural Gas