IAC logo
IAC Assessment: TN0290
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0290
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1986
Principal Product WORK PANTS
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales $500,000-$1,000,000
# of Employees 375
Plant Area (Sq.Ft.) 0
Annual Production 2,419,200 Pieces
Production Hrs. Annual 2,040
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,965 1,300,997 kWh $0.07
Natural Gas $33,403 7,052 MMBtu $4.74
TOTAL ENERGY COSTS $126,368
RECOMMENDED SAVINGS* $15,179 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,979
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS Savings:
$8,544
Cost:
$9,080
$8,544 119,578 - - $8,544
119,578
kWh
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,673
Cost:
$3,100
- - $1,673 353 -
-
kWh
$1,673
353
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$948
Cost:
$1,885
- - $948 200 -
-
kWh
$948
200
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,162
Cost:
-
$3,162 44,256 - - $3,162
44,256
kWh
-
-
MMBtu
05: 2.1222 INSTALL TURBULATORS Savings:
$469
Cost:
$500
- - $469 99 -
-
kWh
$469
99
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$90
Cost:
$50
- - $90 19 -
-
kWh
$90
19
MMBtu
07: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$293
Cost:
$500
$293 4,103 - - $293
4,103
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,179
Cost:
$15,115
$11,999 167,937 $3,180 671 $11,999
167,937
kWh
$3,180
671
MMBtu
TOTAL IMPLEMENTED Savings:
$10,979
Cost:
$13,180
$8,837 123,681 $2,142 452 $8,837
123,681
kWh
$2,142
452
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas