IAC Assessment: TN0403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product PENCIL LEADS
NAICS n/a
SIC 3952 - Lead Pencils And Art Goods
Sales $1,000,000-$5,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 1,800,000 Pieces
Production Hrs. Annual 0
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,356 2,250,586 kWh $0.06
Natural Gas $22,467 4,515 MMBtu $4.98
Fuel Oil #2 $32,398 7,039 MMBtu $4.60
TOTAL ENERGY COSTS $179,221
RECOMMENDED SAVINGS* $14,162 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,484
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$5,335
Cost:
$1,280
- - $2,085 417 $3,250 711 - - -
-
kWh
$2,085
417
MMBtu
$3,250
711
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,167
Cost:
$2,442
- - $3,865 773 $302 66 - - -
-
kWh
$3,865
773
MMBtu
$302
66
MMBtu
-
-
$
03: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$1,886
Cost:
$4,964
$1,886 34,291 - - - - - - $1,886
34,291
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$501
Cost:
$356
- - $195 39 $306 67 - - -
-
kWh
$195
39
MMBtu
$306
67
MMBtu
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$213
Cost:
$300
- - $85 17 $128 28 - - -
-
kWh
$85
17
MMBtu
$128
28
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$532
Cost:
-
$532 9,672 - - - - - - $532
9,672
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$742
Cost:
$236
$742 13,482 - - - - - - $742
13,482
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$322
Cost:
$180
$322 5,862 - - - - - - $322
5,862
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$303
Cost:
$963
$274 4,982 - - - - $29 - $274
4,982
kWh
-
-
MMBtu
-
-
MMBtu
$29
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$161
Cost:
$90
$161 2,931 - - - - - - $161
2,931
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,162
Cost:
$10,811
$3,917 71,220 $6,230 1,246 $3,986 872 $29 - $3,917
71,220
kWh
$6,230
1,246
MMBtu
$3,986
872
MMBtu
$29
-
$
TOTAL IMPLEMENTED Savings:
$7,484
Cost:
$2,262
$1,435 26,085 $2,365 473 $3,684 806 - - $1,435
26,085
kWh
$2,365
473
MMBtu
$3,684
806
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes