IAC logo
IAC Assessment: TN0404
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product SWEAT SHIRTS & JACKETS
NAICS n/a
SIC 2329 - Men's and Boys' Clothing, Not Elsewhere Classified
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pieces
Production Hrs. Annual 2,210
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,834 711,899 kWh $0.07
Natural Gas $23,926 4,150 MMBtu $5.77
TOTAL ENERGY COSTS $76,760
RECOMMENDED SAVINGS* $13,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,831
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,398
Cost:
$4,800
- - $1,398 241 - - -
-
kWh
$1,398
241
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,555
Cost:
$390
$4,555 61,547 - - - - $4,555
61,547
kWh
-
-
MMBtu
-
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$2,724
Cost:
$11,289
$2,494 33,705 - - $230 - $2,494
33,705
kWh
-
-
MMBtu
$230
-
$
04: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$760
Cost:
-
- - $760 131 - - -
-
kWh
$760
131
MMBtu
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,475
Cost:
$1,140
$1,475 19,930 - - - - $1,475
19,930
kWh
-
-
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,258
Cost:
-
$1,258 16,999 - - - - $1,258
16,999
kWh
-
-
MMBtu
-
-
$
07: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$716
Cost:
$50
$716 9,672 - - - - $716
9,672
kWh
-
-
MMBtu
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$195
Cost:
-
$195 2,638 - - - - $195
2,638
kWh
-
-
MMBtu
-
-
$
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$152
Cost:
-
$152 2,052 - - - - $152
2,052
kWh
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$347
Cost:
$264
$347 4,689 - - - - $347
4,689
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,580
Cost:
$17,933
$11,192 151,232 $2,158 372 $230 - $11,192
151,232
kWh
$2,158
372
MMBtu
$230
-
$
TOTAL IMPLEMENTED Savings:
$7,831
Cost:
$704
$7,071 95,545 $760 131 - - $7,071
95,545
kWh
$760
131
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes