IAC logo
IAC Assessment: TN0411
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0411
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product HOSIERY
NAICS n/a
SIC 2252 - Hosiery, Nec
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,235 1,844,666 kWh $0.06
Natural Gas $25,947 5,186 MMBtu $5.00
TOTAL ENERGY COSTS $139,182
RECOMMENDED SAVINGS* $8,466 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,789
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,200
Cost:
$475
- - $1,200 240 -
-
kWh
$1,200
240
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,431
Cost:
-
$2,431 39,859 - - $2,431
39,859
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$681
Cost:
$1,850
- - $681 109 -
-
kWh
$681
109
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$429
Cost:
$190
- - $429 86 -
-
kWh
$429
86
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,377
Cost:
$354
$1,377 22,567 - - $1,377
22,567
kWh
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$948
Cost:
-
$948 15,533 - - $948
15,533
kWh
-
-
MMBtu
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$211
Cost:
$482
- - $211 42 -
-
kWh
$211
42
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$626
Cost:
$210
$626 10,258 - - $626
10,258
kWh
-
-
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$317
Cost:
-
$317 5,275 - - $317
5,275
kWh
-
-
MMBtu
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$246
Cost:
$635
$246 4,103 - - $246
4,103
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,466
Cost:
$4,196
$5,945 97,595 $2,521 477 $5,945
97,595
kWh
$2,521
477
MMBtu
TOTAL IMPLEMENTED Savings:
$5,789
Cost:
$3,561
$3,268 53,633 $2,521 477 $3,268
53,633
kWh
$2,521
477
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas