Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1990 |
Principal Product | LADIES HOSIERY |
NAICS | n/a |
SIC | 2251 - Women's Full-Length and Knee-Length Hosiery, Except Socks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 156 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 24,000,000 Pieces |
Production Hrs. Annual | 4,125 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $93,717 | 1,667,351 | kWh | $0.06 |
Fuel Oil #2 | $76,428 | 16,633 | MMBtu | $4.59 |
TOTAL ENERGY COSTS | $170,145 | |||
RECOMMENDED SAVINGS* | $24,352 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,352 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $17,798 Cost: $7,260 |
$11,604 | 207,210 | $6,194 | 1,355 | - | - |
$11,604 207,210 kWh |
$6,194 1,355 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN |
Savings: $5,149 Cost: $12,840 |
$4,825 | 86,166 | - | - | $324 | - |
$4,825 86,166 kWh |
- - MMBtu |
$324 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $256 Cost: $300 |
- | - | $256 | 56 | - | - |
- - kWh |
$256 56 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $919 Cost: $563 |
$919 | 16,413 | - | - | - | - |
$919 16,413 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $230 Cost: $325 |
$230 | 4,103 | - | - | - | - |
$230 4,103 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,352 Cost: $21,288 |
$17,578 | 313,892 | $6,450 | 1,411 | $324 | - | $17,578 313,892 kWh |
$6,450 1,411 MMBtu |
$324 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,352 Cost: $21,288 |
$17,578 | 313,892 | $6,450 | 1,411 | $324 | - | $17,578 313,892 kWh |
$6,450 1,411 MMBtu |
$324 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes |