IAC Center | University of Tennessee |
---|---|
Assessment Year | 1991 |
Principal Product | MEN'S SUITS,SPORTS COATS |
NAICS | n/a |
SIC | 2311 - Men's and Boys' Suits, Coats, and Overcoats |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 312,000 Pieces |
Production Hrs. Annual | 2,160 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $179,634 | 2,919,695 | kWh | $0.06 |
Natural Gas | $60,190 | 18,484 | MMBtu | $3.26 |
Fuel Oil #2 | $9,345 | 1,470 | MMBtu | $6.36 |
TOTAL ENERGY COSTS | $249,169 | |||
RECOMMENDED SAVINGS* | $25,933 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,933 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $10,212 Cost: $1,840 |
$10,212 | 164,713 | - | - | - | - | - | - |
$10,212 164,713 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN |
Savings: $8,262 Cost: - |
$7,668 | 123,681 | - | - | - | - | $594 | - |
$7,668 123,681 kWh |
- - MMBtu |
- - MMBtu |
$594 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $710 Cost: $628 |
$710 | 11,430 | - | - | - | - | - | - |
$710 11,430 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2153 CLOSE OFF UNNEEDED STEAM LINES |
Savings: $762 Cost: - |
- | - | $667 | 202 | $95 | 15 | - | - |
- - kWh |
$667 202 MMBtu |
$95 15 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $3,562 Cost: - |
$3,562 | 57,444 | - | - | - | - | - | - |
$3,562 57,444 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $399 Cost: - |
- | - | $399 | 121 | - | - | - | - |
- - kWh |
$399 121 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $319 Cost: - |
- | - | $281 | 85 | $38 | 6 | - | - |
- - kWh |
$281 85 MMBtu |
$38 6 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,254 Cost: - |
$1,254 | 20,223 | - | - | - | - | - | - |
$1,254 20,223 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $122 Cost: $25 |
- | - | $109 | 33 | $13 | 2 | - | - |
- - kWh |
$109 33 MMBtu |
$13 2 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $69 Cost: - |
- | - | $63 | 19 | $6 | 1 | - | - |
- - kWh |
$63 19 MMBtu |
$6 1 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $62 Cost: $146 |
- | - | $56 | 17 | $6 | 1 | - | - |
- - kWh |
$56 17 MMBtu |
$6 1 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $200 Cost: $410 |
$200 | 3,224 | - | - | - | - | - | - |
$200 3,224 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,933 Cost: $3,049 |
$23,606 | 380,715 | $1,575 | 477 | $158 | 25 | $594 | - | $23,606 380,715 kWh |
$1,575 477 MMBtu |
$158 25 MMBtu |
$594 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,933 Cost: $3,049 |
$23,606 | 380,715 | $1,575 | 477 | $158 | 25 | $594 | - | $23,606 380,715 kWh |
$1,575 477 MMBtu |
$158 25 MMBtu |
$594 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes |