IAC Assessment: TN0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0418
IAC Center University of Tennessee
Assessment Year 1991
Principal Product MEN'S SUITS,SPORTS COATS
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 312,000 Pieces
Production Hrs. Annual 2,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,634 2,919,695 kWh $0.06
Natural Gas $60,190 18,484 MMBtu $3.26
Fuel Oil #2 $9,345 1,470 MMBtu $6.36
TOTAL ENERGY COSTS $249,169
RECOMMENDED SAVINGS* $25,933 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,933
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$10,212
Cost:
$1,840
$10,212 164,713 - - - - - - $10,212
164,713
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$8,262
Cost:
-
$7,668 123,681 - - - - $594 - $7,668
123,681
kWh
-
-
MMBtu
-
-
MMBtu
$594
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$710
Cost:
$628
$710 11,430 - - - - - - $710
11,430
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$762
Cost:
-
- - $667 202 $95 15 - - -
-
kWh
$667
202
MMBtu
$95
15
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,562
Cost:
-
$3,562 57,444 - - - - - - $3,562
57,444
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$399
Cost:
-
- - $399 121 - - - - -
-
kWh
$399
121
MMBtu
-
-
MMBtu
-
-
$
07: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$319
Cost:
-
- - $281 85 $38 6 - - -
-
kWh
$281
85
MMBtu
$38
6
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,254
Cost:
-
$1,254 20,223 - - - - - - $1,254
20,223
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$122
Cost:
$25
- - $109 33 $13 2 - - -
-
kWh
$109
33
MMBtu
$13
2
MMBtu
-
-
$
10: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$69
Cost:
-
- - $63 19 $6 1 - - -
-
kWh
$63
19
MMBtu
$6
1
MMBtu
-
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$62
Cost:
$146
- - $56 17 $6 1 - - -
-
kWh
$56
17
MMBtu
$6
1
MMBtu
-
-
$
12: 2.6232 INSTALL SET-BACK TIMERS Savings:
$200
Cost:
$410
$200 3,224 - - - - - - $200
3,224
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$25,933
Cost:
$3,049
$23,606 380,715 $1,575 477 $158 25 $594 - $23,606
380,715
kWh
$1,575
477
MMBtu
$158
25
MMBtu
$594
-
$
TOTAL IMPLEMENTED Savings:
$25,933
Cost:
$3,049
$23,606 380,715 $1,575 477 $158 25 $594 - $23,606
380,715
kWh
$1,575
477
MMBtu
$158
25
MMBtu
$594
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes