IAC logo
IAC Assessment: TN0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product MEN'S SUITS,SPORTS COATS
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 312,000 Pieces
Production Hrs. Annual 2,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,634 2,919,695 kWh $0.06
Natural Gas $60,190 18,484 MMBtu $3.26
Fuel Oil #2 $9,345 1,470 MMBtu $6.36
TOTAL ENERGY COSTS $249,169
RECOMMENDED SAVINGS* $25,933 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,933
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$10,212
Cost:
$1,840
$10,212 164,713 - - - - - - $10,212
164,713
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$8,262
Cost:
-
$7,668 123,681 - - - - $594 - $7,668
123,681
kWh
-
-
MMBtu
-
-
MMBtu
$594
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$710
Cost:
$628
$710 11,430 - - - - - - $710
11,430
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$762
Cost:
-
- - $667 202 $95 15 - - -
-
kWh
$667
202
MMBtu
$95
15
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,562
Cost:
-
$3,562 57,444 - - - - - - $3,562
57,444
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$399
Cost:
-
- - $399 121 - - - - -
-
kWh
$399
121
MMBtu
-
-
MMBtu
-
-
$
07: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$319
Cost:
-
- - $281 85 $38 6 - - -
-
kWh
$281
85
MMBtu
$38
6
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,254
Cost:
-
$1,254 20,223 - - - - - - $1,254
20,223
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$122
Cost:
$25
- - $109 33 $13 2 - - -
-
kWh
$109
33
MMBtu
$13
2
MMBtu
-
-
$
10: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$69
Cost:
-
- - $63 19 $6 1 - - -
-
kWh
$63
19
MMBtu
$6
1
MMBtu
-
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$62
Cost:
$146
- - $56 17 $6 1 - - -
-
kWh
$56
17
MMBtu
$6
1
MMBtu
-
-
$
12: 2.6232 INSTALL SET-BACK TIMERS Savings:
$200
Cost:
$410
$200 3,224 - - - - - - $200
3,224
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$25,933
Cost:
$3,049
$23,606 380,715 $1,575 477 $158 25 $594 - $23,606
380,715
kWh
$1,575
477
MMBtu
$158
25
MMBtu
$594
-
$
TOTAL IMPLEMENTED Savings:
$25,933
Cost:
$3,049
$23,606 380,715 $1,575 477 $158 25 $594 - $23,606
380,715
kWh
$1,575
477
MMBtu
$158
25
MMBtu
$594
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes