IAC Assessment: TN0482
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0482
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product Industrial and airplane carburators
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $5,000,000-$10,000,000
# of Employees 106
Plant Area (Sq.Ft.) 90,000
Annual Production 70,000 Pieces
Production Hrs. Annual 2,210
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,180 1,859,906 kWh $0.06
Natural Gas $14,428 2,677 MMBtu $5.39
TOTAL ENERGY COSTS $131,608
RECOMMENDED SAVINGS* $37,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$18,977
Cost:
$30,900
$18,977 272,274 $18,977
272,274
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,459
Cost:
$1,504
$1,459 23,154 $1,459
23,154
kWh
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,234
Cost:
$600
$5,234 76,495 $5,234
76,495
kWh
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$923
Cost:
$185
$923 14,654 $923
14,654
kWh
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$277
Cost:
$720
$277 4,396 $277
4,396
kWh
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,141
Cost:
-
$10,141 - $10,141
-
kWh
TOTAL RECOMMENDED Savings:
$37,011
Cost:
$33,909
$37,011 390,973 $37,011
390,973
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage