IAC Assessment: TN0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product Woodworking and Metalworking Machine
NAICS n/a
SIC 3553 - Woodworking Machinery
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 250,000
Annual Production 0 Units
Production Hrs. Annual 2,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $604,900 9,910,610 kWh $0.06
Natural Gas $102,903 18,170 MMBtu $5.66
TOTAL ENERGY COSTS $707,803
RECOMMENDED SAVINGS* $29,278 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,278
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2514 COVER OPEN TANKS Savings:
$4,418
Cost:
$1,308
- - $4,418 789 -
-
kWh
$4,418
789
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,703
Cost:
$480
$5,703 89,390 - - $5,703
89,390
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,346
Cost:
$4,628
$5,346 87,632 - - $5,346
87,632
kWh
-
-
MMBtu
04: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$1,562
Cost:
$2,640
$1,562 81,770 - - $1,562
81,770
kWh
-
-
MMBtu
05: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS Savings:
$3,182
Cost:
$1,320
$3,182 52,169 - - $3,182
52,169
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,413
Cost:
-
$2,413 39,566 - - $2,413
39,566
kWh
-
-
MMBtu
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,484
Cost:
$560
$1,484 24,326 - - $1,484
24,326
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$54
Cost:
$80
$54 879 - - $54
879
kWh
-
-
MMBtu
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,116
Cost:
-
$5,116 - - - $5,116
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,278
Cost:
$11,016
$24,860 375,732 $4,418 789 $24,860
375,732
kWh
$4,418
789
MMBtu
TOTAL IMPLEMENTED Savings:
$29,278
Cost:
$11,016
$24,860 375,732 $4,418 789 $24,860
375,732
kWh
$4,418
789
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas