Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1993 |
Principal Product | Plumbing fittings and faucets |
NAICS | n/a |
SIC | 3432 - Plumbing Fixture Fittings And Trim |
Sales | $50,000,000-$100,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 162,000 |
Annual Production | 932,600 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $309,004 | 7,830,891 | kWh | $0.04 |
Natural Gas | $124,075 | 41,762 | MMBtu | $2.97 |
TOTAL ENERGY COSTS | $433,079 | |||
RECOMMENDED SAVINGS* | $60,768 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,445 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $9,438 Cost: $3,000 |
$246 | 6,155 | $9,192 | 3,304 |
$246 6,155 kWh |
$9,192 3,304 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,307 Cost: $1,125 |
$6,084 | 152,110 | $2,223 | 741 |
$6,084 152,110 kWh |
$2,223 741 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $15,927 Cost: $45,191 |
$15,927 | 341,735 | - | - |
$15,927 341,735 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,208 Cost: $1,350 |
- | - | $2,208 | 736 |
- - kWh |
$2,208 736 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,202 Cost: $1,500 |
- | - | $2,202 | 734 |
- - kWh |
$2,202 734 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,362 Cost: $770 |
$7,362 | 184,056 | - | - |
$7,362 184,056 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $7,140 Cost: $9,600 |
$7,140 | 178,488 | - | - |
$7,140 178,488 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,626 Cost: $3,700 |
$2,626 | 65,651 | - | - |
$2,626 65,651 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,227 Cost: $1,416 |
$2,227 | 55,686 | - | - |
$2,227 55,686 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,383 Cost: $1,856 |
$1,383 | 34,584 | - | - |
$1,383 34,584 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $318 Cost: $375 |
- | - | $318 | 106 |
- - kWh |
$318 106 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,196 Cost: $610 |
$1,196 | 29,894 | - | - |
$1,196 29,894 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $235 Cost: $500 |
$235 | 5,862 | - | - |
$235 5,862 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $199 Cost: $330 |
$199 | 4,982 | - | - |
$199 4,982 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,768 Cost: $71,323 |
$44,625 | 1,059,203 | $16,143 | 5,621 | $44,625 1,059,203 kWh |
$16,143 5,621 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,445 Cost: $11,392 |
$17,302 | 432,591 | $16,143 | 5,621 | $17,302 432,591 kWh |
$16,143 5,621 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |