IAC logo
IAC Assessment: TN0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1994
Principal Product Extruded rubber and plastic automotive weather stripping
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 560
Plant Area (Sq.Ft.) 190,000
Annual Production 720,000 Pounds
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $838,506 16,665,006 kWh $0.05
Natural Gas $117,805 13,370 MMBtu $8.81
TOTAL ENERGY COSTS $956,311
RECOMMENDED SAVINGS* $138,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $138,229
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$81,008
Cost:
$114,200
$81,008 1,620,164 - - $81,008
1,620,164
kWh
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$24,983
Cost:
$1,750
- - $24,983 2,839 -
-
kWh
$24,983
2,839
MMBtu
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$12,822
Cost:
$26,900
$12,822 256,448 - - $12,822
256,448
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,244
Cost:
$2,200
$14,244 284,877 - - $14,244
284,877
kWh
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,022
Cost:
$3,735
$2,022 40,445 - - $2,022
40,445
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,597
Cost:
$460
$1,597 31,946 - - $1,597
31,946
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$952
Cost:
$796
$952 19,050 - - $952
19,050
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$601
Cost:
$430
$601 12,016 - - $601
12,016
kWh
-
-
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$161
Cost:
$345
$161 3,224 - - $161
3,224
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$138,390
Cost:
$150,816
$113,407 2,268,170 $24,983 2,839 $113,407
2,268,170
kWh
$24,983
2,839
MMBtu
TOTAL IMPLEMENTED Savings:
$138,229
Cost:
$150,471
$113,246 2,264,946 $24,983 2,839 $113,246
2,264,946
kWh
$24,983
2,839
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas