IAC Assessment: TN0556
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0556
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1995
Principal Product Molded polyurethane frames, signs and headboards
NAICS n/a
SIC 2431 - Millwork
Sales $1,000,000-$5,000,000
# of Employees 120
Plant Area (Sq.Ft.) 68,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,767 1,160,317 kWh $0.08
LPG $27,315 3,560 MMBtu $7.67
TOTAL ENERGY COSTS $122,892
RECOMMENDED SAVINGS* $218,548 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $206,129
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (haz) Primary Raw Material Electricity Usage Natural Gas Solid Waste (haz) Primary Raw Material
$ kWh $ MMBtu $ lb $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,874
Cost:
$7,950
- - $3,874 507 - - - - -
-
kWh
$3,874
507
MMBtu
-
-
lb
-
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,587
Cost:
$18,500
$3,992 81,770 - - - - $595 - $3,992
81,770
kWh
-
-
MMBtu
-
-
lb
$595
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$660
Cost:
$1,240
$660 7,327 - - - - - - $660
7,327
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$374
Cost:
$38
$374 4,396 - - - - - - $374
4,396
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,298
Cost:
-
$3,298 - - - - - - - $3,298
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 3.7211 MODIFY MATERIAL APPLICATION METHODS Savings:
$205,755
Cost:
$81,770
- - - - $405 3,600 $205,350 - -
-
kWh
-
-
MMBtu
$405
3,600
lb
$205,350
-
$
TOTAL RECOMMENDED Savings:
$218,548
Cost:
$109,498
$8,324 93,493 $3,874 507 $405 3,600 $205,945 - $8,324
93,493
kWh
$3,874
507
MMBtu
$405
3,600
lb
$205,945
-
$
TOTAL IMPLEMENTED Savings:
$206,129
Cost:
$81,808
$374 4,396 - - $405 3,600 $205,350 - $374
4,396
kWh
-
-
MMBtu
$405
3,600
lb
$205,350
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (haz) Primary Raw Material Electricity Usage Natural Gas Solid Waste (haz) Primary Raw Material