Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1995 |
Principal Product | Molded polyurethane frames, signs and headboards |
NAICS | n/a |
SIC | 2431 - Millwork |
Sales | $1,000,000-$5,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 68,000 |
Annual Production | 1,000,000 Pounds |
Production Hrs. Annual | 6,864 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $94,767 | 1,160,317 | kWh | $0.08 |
LPG | $27,315 | 3,560 | MMBtu | $7.67 |
TOTAL ENERGY COSTS | $122,892 | |||
RECOMMENDED SAVINGS* | $218,548 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $206,129 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $3,874 Cost: $7,950 |
- | - | $3,874 | 507 | - | - | - | - |
- - kWh |
$3,874 507 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $4,587 Cost: $18,500 |
$3,992 | 81,770 | - | - | - | - | $595 | - |
$3,992 81,770 kWh |
- - MMBtu |
- - lb |
$595 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $660 Cost: $1,240 |
$660 | 7,327 | - | - | - | - | - | - |
$660 7,327 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $374 Cost: $38 |
$374 | 4,396 | - | - | - | - | - | - |
$374 4,396 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,298 Cost: - |
$3,298 | - | - | - | - | - | - | - |
$3,298 - kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.7211 MODIFY MATERIAL APPLICATION METHODS |
Savings: $205,755 Cost: $81,770 |
- | - | - | - | $405 | 3,600 | $205,350 | - |
- - kWh |
- - MMBtu |
$405 3,600 lb |
$205,350 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $218,548 Cost: $109,498 |
$8,324 | 93,493 | $3,874 | 507 | $405 | 3,600 | $205,945 | - | $8,324 93,493 kWh |
$3,874 507 MMBtu |
$405 3,600 lb |
$205,945 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $206,129 Cost: $81,808 |
$374 | 4,396 | - | - | $405 | 3,600 | $205,350 | - | $374 4,396 kWh |
- - MMBtu |
$405 3,600 lb |
$205,350 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material | Electricity Usage | Natural Gas | Solid Waste (haz) | Primary Raw Material |