Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1996 |
Principal Product | Plastic Extrusion Molding |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 54 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 5,000,000 Pounds |
Production Hrs. Annual | 6,732 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $42,340 | 1,194,607 | kWh | $0.04 |
Electricity Demand | $25,963 | 3,134 | kW-months/year | $8.28 |
Electricity Fees | $1,144 | - | $ | - |
Natural Gas | $6,907 | 1,057 | MMBtu | $6.53 |
TOTAL ENERGY COSTS | $121,150 | |||
RECOMMENDED SAVINGS* | $32,637 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $318 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS |
Savings: $18,480 Cost: - |
- | - | - | - | $18,480 | 96,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,480 96,000 lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $3,578 Cost: $4,440 |
$(-500) | (-16,706) | - | - | - | - | $(-5,712) | - | $(-200) | - | - | - | $9,990 | - |
$(-500) (-16,706) kWh |
- - kW-months/year |
- - lb |
$(-5,712) - $ |
$(-200) - $ |
- - $ |
$9,990 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $5,833 Cost: $17,762 |
$2,971 | 99,062 | $2,122 | 208 | - | - | - | - | - | - | $740 | - | - | - |
$2,971 99,062 kWh |
$2,122 208 kW-months/year |
- - lb |
- - $ |
- - $ |
$740 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $4,428 Cost: $4,000 |
- | - | $4,428 | 432 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$4,428 432 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $318 Cost: $30 |
$158 | 5,275 | $160 | 12 | - | - | - | - | - | - | - | - | - | - |
$158 5,275 kWh |
$160 12 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,637 Cost: $26,232 |
$2,629 | 87,631 | $6,710 | 652 | $18,480 | 96,000 | $(-5,712) | - | $(-200) | - | $740 | - | $9,990 | - | $2,629 87,631 kWh |
$6,710 652 kW-months/year |
$18,480 96,000 lb |
$(-5,712) - $ |
$(-200) - $ |
$740 - $ |
$9,990 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $318 Cost: $30 |
$158 | 5,275 | $160 | 12 | - | - | - | - | - | - | - | - | - | - | $158 5,275 kWh |
$160 12 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | By-product Production |