IAC logo
IAC Assessment: TN0570
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0570
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Paper and cardboard printed media
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 75,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 7,344
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,392 1,308,910 kWh $0.04
Electricity Demand $27,802 4,245 kW-months/year $6.55
Natural Gas $6,983 1,046 MMBtu $6.68
TOTAL ENERGY COSTS $108,747
RECOMMENDED SAVINGS* $12,424 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,683
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,660
Cost:
$8,640
- - - - - - $7,960 340,000 $(-2,300) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,960
340,000
lb
$(-2,300)
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,191
Cost:
-
- - $2,191 240 - - - - - - -
-
kWh
$2,191
240
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,907
Cost:
$1,000
$1,317 42,497 - - $590 88 - - - - $1,317
42,497
kWh
-
-
kW-months/year
$590
88
MMBtu
-
-
lb
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$1,347
Cost:
$150
$909 29,308 $438 48 - - - - - - $909
29,308
kWh
$438
48
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$698
Cost:
-
- - - - $698 - - - - - -
-
kWh
-
-
kW-months/year
$698
-
MMBtu
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$429
Cost:
$54
$100 3,224 $329 36 - - - - - - $100
3,224
kWh
$329
36
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$192
Cost:
-
$82 2,638 $110 12 - - - - - - $82
2,638
kWh
$110
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$12,424
Cost:
$9,844
$2,408 77,667 $3,068 336 $1,288 88 $7,960 340,000 $(-2,300) - $2,408
77,667
kWh
$3,068
336
kW-months/year
$1,288
88
MMBtu
$7,960
340,000
lb
$(-2,300)
-
$
TOTAL IMPLEMENTED Savings:
$3,683
Cost:
$1,204
$2,326 75,029 $767 84 $590 88 - - - - $2,326
75,029
kWh
$767
84
kW-months/year
$590
88
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes